Building survey Cost Calculator

A survey is priced on the size, age and value of the property. In Q3 2026 a RICS Level 2 (HomeBuyer) report costs about £400–£900 and a Level 3 full building survey £600–£1,700. Older, larger or previously-extended homes sit at the top of both ranges —โ€ฆ

Open the calculator →
From our published figures
Regional rates applied
30 seconds
100% free ยท No signup

Price building survey in 30 seconds

2 steps, using the figures from our cost guide.

How this calculator works

Every figure in this calculator is the one published in the cost table on our building survey guide. Pick the option that matches your job and the calculator returns that published range, adjusted for your region - it does not model anything the guide does not already say.

That is deliberate. A calculator whose rates drift from the page it sits under is worse than no calculator, because two numbers on the same site disagree.

What it cannot know: access, the condition of what is already there, and anything structural. Those are what separate three real quotes from each other.

Published building survey costs (2026)

OptionTypical 2026 costNotes
Londonยฃ366โ€“ยฃ671
South Eastยฃ336โ€“ยฃ616
East of Englandยฃ315โ€“ยฃ578
South Westยฃ306โ€“ยฃ561
Midlandsยฃ300โ€“ยฃ550
North Westยฃ288โ€“ยฃ528
Yorkshire & North Eastยฃ282โ€“ยฃ517
Walesยฃ282โ€“ยฃ517

These are the figures from our building survey cost guide.

Building survey calculator โ€” FAQs

On a property over roughly 50 years old, previously extended, or one you plan to alter, usually yes. The extra £200–£800 buys a report that opens up more of the structure and gives repair advice rather than just a traffic-light rating. On a modern, conventional house a Level 2 is normally enough.

No, and this catches buyers out every year. A mortgage valuation is for the lender's benefit — it confirms the property is adequate security for the loan. It is not a survey of the condition and it carries no duty to tell you about defects.

The inspection is 1–2 hours for a Level 2 and 3–4 hours or more for a Level 3. Most surveyors return the written report within 3–5 working days of the visit.

Yes — that is one of its main practical uses. A costed schedule of repairs gives you an evidenced basis to go back to the seller rather than an opinion.