House Extensions ยท UK-Wide ยท Always Free

House Extension Quotes
From Local UK Builders

Compare written quotes from local extension builders in your area. Single-storey, double-storey and side extensions โ€” up to 3 free quotes in 24 hours, across 519 towns.

  • You choose who to hire — we never charge you
  • Single-storey extensions from ยฃ22,000 nationally
  • Double-storey extensions from ยฃ44,000 nationally
  • Completely free โ€” no obligation to proceed
Get My 3 Free Extension Quotes
Takes 30 seconds ยท No spam ยท No obligation

What type of extension do you need?

Every type below has its own page with 2026 price ranges, what moves the number, and a quote form matched to that job โ€” so your enquiry reaches builders who do that kind of work. Not sure yet? The cost guide compares them side by side.

Rear extensionThe most common single-storey extension โ€” kitchen-diners and living space.£22,000โ€“£67,000See costs & get quotes →Side returnFills the alley beside a Victorian terrace. Access usually sets the price.£25,000โ€“£55,000See costs & get quotes →WraparoundRear and side combined โ€” the biggest ground-floor change you can make.£45,000โ€“£100,000See costs & get quotes →Single-storeyOne floor, any elevation. The baseline every other type is priced against.£22,000โ€“£67,000See costs & get quotes →Double-storeyTwo floors for roughly 1.5× the single-storey cost โ€” the best value per m².£44,000โ€“£120,000See costs & get quotes →Kitchen extensionBuild cost plus the fit-out, which is usually the bigger variable.£25,000โ€“£75,000See costs & get quotes →Bathroom extensionSmall footprint, high services cost โ€” drainage drives the number.£12,000โ€“£30,000See costs & get quotes →ConservatoryThe cheapest way to add floor area, with the biggest trade-offs.£8,000โ€“£30,000See costs & get quotes →PorchOften permitted development. Small job, quick return on kerb appeal.£3,000โ€“£10,000See costs & get quotes →OrangeryBetween a conservatory and a full extension โ€” solid roof, more glazing.£20,000โ€“£50,000See costs & get quotes →Garden roomDetached, usually no planning permission, no impact on the house.£10,000โ€“£35,000See costs & get quotes →Granny annexePrefab through bespoke, plus the VAT and planning rules.£40,000โ€“£100,000+See costs & get quotes →

How Much Does a House Extension Cost in the UK?

Full cost guide โ†’
Single-Storey Extension
Rear or Side-Return Extension
ยฃ22,000 โ€“ ยฃ67,000

The most popular choice for UK terraces and semis. Adds a kitchen-diner or extra living space at ground level. Typically 3โ€“5m deep, completed in 10โ€“14 weeks.

Get quotes for this โ†’
Double-Storey Extension
Full Double-Storey Rear Extension
ยฃ44,000 โ€“ ยฃ121,000

Maximum space gain in a single build โ€” adds a ground-floor room and a bedroom above. Strong ROI in most UK property markets. Requires full planning permission.

Get quotes for this โ†’
Side Extension
Side-Return or Infill Extension
ยฃ14,500 โ€“ ยฃ50,500

Ideal for terraced homes with a narrow side alley. Transforms a cramped kitchen into a full-width open-plan space. Often combined with a rear extension.

Get quotes for this โ†’
Your Project
Get an Accurate Quote

Costs vary by region, size and specification. Compare 3 quotes from local extension builders for your exact project.

Get free quotes โ†’

Regional pricing note: Extension costs vary significantly by region. London and South East prices are typically 25โ€“40% above the national average due to higher labour costs and stricter planning requirements. Use our local cost guide or enter your postcode above for town-specific ranges.

House extension costs at a glance โ€” 2026

Single-storey rear extension โ€” typical 2026 range by region, from this page's cost table.

Londonยฃ33,000 โ€“ ยฃ67,000South Eastยฃ30,000 โ€“ ยฃ60,000Southernยฃ27,000 โ€“ ยฃ55,000West Midlandsยฃ25,000 โ€“ ยฃ50,000Yorkshireยฃ23,000 โ€“ ยฃ47,000North Eastยฃ22,000 โ€“ ยฃ45,000South Walesยฃ22,000 โ€“ ยฃ44,000

Source: BestBuilders 2026 quote data ยท 519 UK towns

🧮 Free 2026 Extension Calculators
🏗Extension Cost CalculatorAny extension type · full build cost — try it free →📐Single Storey Extension CalculatorSpec · size · fit-out · glazing — try it free →🏡Rear Extension CalculatorDepth × width · knock-through & steels — try it free →🪴Conservatory Cost CalculatorNew conservatory by style & size — try it free →📐Side Return CalculatorLength, width, spec & the party wall a terrace needs — try it free →🏡Wraparound CalculatorFloor area, spec & the steels opening the corner needs — try it free →🏢Double-Storey CalculatorTwo floors sharing one set of foundations — try it free →🍳Kitchen Extension CalculatorShell and kitchen fit-out priced separately — try it free →🛁Bathroom Extension CalculatorSmall footprint, high services cost, drainage priced properly — try it free →🚪Porch CalculatoruPVC, brick & glass, with the 3m² permitted development check — try it free →🪟Orangery CalculatorFrame, lantern & base, with a brick extension alongside — try it free →🏡Garden Room CalculatorSize, insulation spec, foundations & the planning position — try it free →

House Extensions โ€” What You Need to Know

A house extension is one of the most effective ways to add space and value to your UK home without the cost and upheaval of moving. Whether you need a larger kitchen, an extra bedroom, a home office or a new family living space, an extension lets you reshape your home around how you actually live.

The key to a successful extension is choosing the right builder. BestBuilders passes your job to local extension builders who work with local planning policies, UK building regulations and the structural demands of different property types โ€” from Victorian terraces to post-war semis.

We do not vet the builders who receive your enquiry, so insurance, qualifications and references are yours to check — the section below sets out exactly what to ask for.

How we vet builders โ†’

How It Works

1
Tell us your extension type and postcode
Takes 60 seconds. No drawings or plans needed.
2
We match you with extension specialists
Up to 3 local builders in your area, within 24 hours.
3
Compare quotes, reviews and timelines
No obligation to proceed with any builder.

Before You Hire, Check They:

โœ“ Carry public liability insurance — ask for the certificate and check the cover level
โœ“ Hold relevant trade qualifications — verify FMB or CIOB membership on the body’s own register
โœ“ Can give recent local references you can visit — ask to see a finished job nearby
โœ“ Have a recent review history โ€” we monitor listed trades and remove them for sustained negative feedback

Permitted Development & Planning Permission for House Extensions

๐Ÿก Permitted Development

Many single-storey rear extensions qualify under Permitted Development (PD) rights in England โ€” meaning no formal planning application is required, as long as they stay within size, height and materials limits. PD rights do not apply in Scotland, Wales or Northern Ireland in the same way. Your matched builder will advise on PD eligibility for your specific property.

๐Ÿ“‹ Full Planning Permission

Double-storey extensions, extensions on flats, and properties in conservation areas or with an Article 4 Direction typically require a full planning application. The process takes 8โ€“10 weeks on average. Your builder will advise on what's required for your local authority and can recommend architects who handle extension planning regularly.

๐Ÿ”ง Building Regulations

All extensions โ€” including those under Permitted Development โ€” require Building Regulations approval. This covers structural safety, fire safety, energy efficiency, ventilation and drainage. Building control inspections happen at key stages of the build. Your builder manages this process and provides the completion certificate at the end.

Party Wall Act: If your extension is close to or on the boundary with a neighbouring property, you may need to serve a Party Wall Notice and potentially commission a party wall surveyor. This applies to rear extensions going deeper than 3m (semi-detached) or 6m (detached) under the Neighbour Consultation Scheme. Always check early โ€” the process can add 1โ€“2 months to the pre-construction phase.

House Extension Cost by Region (2026)

Live cost ranges sourced from Best Builders quote data across all 519 UK towns we cover. Figures are mid-range finish; exclude VAT, kitchen and bathroom fit-out, and architectural fees. London prices reflect Zone 1โ€“6 averages.

Region Single-Storey Rear Side Return Double-Storey
Londonยฃ33,000 โ€“ ยฃ67,000ยฃ21,500 โ€“ ยฃ50,500ยฃ67,000 โ€“ ยฃ121,000
South Eastยฃ30,000 โ€“ ยฃ60,000ยฃ19,500 โ€“ ยฃ45,000ยฃ60,000 โ€“ ยฃ108,000
Southernยฃ27,000 โ€“ ยฃ55,000ยฃ17,500 โ€“ ยฃ41,500ยฃ55,000 โ€“ ยฃ99,000
Easternยฃ27,000 โ€“ ยฃ54,000ยฃ17,500 โ€“ ยฃ40,500ยฃ54,000 โ€“ ยฃ97,000
West Midlandsยฃ25,000 โ€“ ยฃ50,000ยฃ16,500 โ€“ ยฃ37,500ยฃ50,000 โ€“ ยฃ90,000
East Midlandsยฃ25,000 โ€“ ยฃ50,000ยฃ16,500 โ€“ ยฃ37,500ยฃ50,000 โ€“ ยฃ90,000
Yorkshireยฃ23,000 โ€“ ยฃ47,000ยฃ15,000 โ€“ ยฃ35,500ยฃ47,000 โ€“ ยฃ85,000
North Westยฃ23,000 โ€“ ยฃ47,000ยฃ15,000 โ€“ ยฃ35,500ยฃ47,000 โ€“ ยฃ85,000
South Westยฃ23,000 โ€“ ยฃ46,000ยฃ15,000 โ€“ ยฃ34,500ยฃ46,000 โ€“ ยฃ83,000
North Eastยฃ22,000 โ€“ ยฃ45,000ยฃ14,500 โ€“ ยฃ34,000ยฃ45,000 โ€“ ยฃ81,000
Scotland (North)ยฃ23,000 โ€“ ยฃ46,000ยฃ15,000 โ€“ ยฃ34,500ยฃ46,000 โ€“ ยฃ82,000
Scotland (South)ยฃ23,000 โ€“ ยฃ46,000ยฃ15,000 โ€“ ยฃ34,500ยฃ46,000 โ€“ ยฃ82,000
South Walesยฃ22,000 โ€“ ยฃ44,000ยฃ14,500 โ€“ ยฃ33,000ยฃ44,000 โ€“ ยฃ79,000
Merseyside & N. Walesยฃ22,000 โ€“ ยฃ44,000ยฃ14,500 โ€“ ยฃ33,000ยฃ44,000 โ€“ ยฃ79,000

Source: Best Builders 2026 Cost Index, aggregated across 519 UK towns. See full cost index โ†’ Ranges reflect mid-spec finishes; premium glazing, structural steel and high-end kitchens move costs above the upper bound. See full cost breakdown โ†’

How to check a builder before you commit

We match you with local trades and step back โ€” the hiring decision is yours. These are the checks that separate a good builder from an expensive mistake, and they take about ten minutes.

Get the quote in writing

An itemised written quote covering labour, materials, waste removal and VAT โ€” not a figure over the phone. If two quotes differ a lot, it is usually because they cover different work, and only the written detail shows you where.

Check the insurance yourself

Ask for the public liability certificate and check the policy is current and in the same trading name as the quote. A logo on a van or a website is not evidence. If the work is notifiable, ask who is registering it.

Ask for recent local work

Two or three jobs of the same type from the last six months, close enough to go and look at. Someone who does good work will offer these before you ask. Be wary of anyone who only has photographs.

On payment: never pay the full amount up front. A deposit against materials is normal; after that, stage payments against completed work are the standard arrangement. Pressure to pay in cash, in full, or on the day is the single most common warning sign.

What’s in an extension price — and what isn’t

Builders quote a build cost, usually per square metre. The professional fees, statutory costs and fit-out sit on top and routinely add 15–25% to the figure people first budget for. Get clear which of these your quote includes before you compare two builders.

Line itemTypical 2026 costIn the builder’s quote?
Build cost, single-storey£2,000–£3,000 per m²Yes — this is the headline number
Build cost, London & South East£2,500–£3,800 per m²Yes
Architect or designer5–12% of build costNo — appointed by you
Structural engineer£500–£1,200No — needed wherever steels are involved
Planning application (householder, England)around £258No — check the current fee, it changes
Building control£500–£1,000No
Party wall surveyor£700–£1,500 per neighbourNo — only if the Act applies
Kitchen or bathroom fit-out£5,000–£25,000+Usually excluded — check what “finished” means
Drainage diversion / deeper foundations£1,000–£6,000No — the classic post-dig variation
VAT20%Extensions are standard-rated, unlike new build

The variation that catches most people is groundworks: a drain, a tree root or poor ground under the footprint is only found once digging starts. Ask each builder what their quote assumes about foundation depth, and what the rate is if it has to go deeper — agreed up front, that is a manageable extra rather than an argument.

How long an extension takes, start to finish

On-site build time is the part people plan for; the approvals in front of it are usually longer. Budget six to twelve months from first conversation to finished room, and start the design and planning work well before you want boots on site.

StageTypical durationNotes
Design and drawings4–8 weeksLonger if you iterate on layouts
Planning decision (householder)8 weeks targetNot needed if it falls under permitted development
Building regulations approval5–8 weeksRuns separately from planning — you need both
Party wall notices2 months’ notice minimumStart early; this one cannot be compressed
Single-storey rear (~20m²) on site10–16 weeksWeather and groundworks drive the range
Side return12–18 weeksAccess is usually the constraint
Double-storey16–24 weeksRoof and structural work add time

Ask for the programme in writing with milestone dates, and agree what happens if it slips. A builder who will commit to a schedule and stage payments against it is telling you something useful about how they run jobs. See the rear extension cost calculator to size the budget first.

Building regulations and the Party Wall Act

Planning and building regulations are two separate approvals. Plenty of extensions need no planning permission because they fall under permitted development — but essentially every extension still needs building regulations approval. Getting one and assuming it covers the other is the most common and most expensive misunderstanding on this kind of project.

The regs your build will be judged against include Part A (structure and foundations), Part L (insulation and heat loss), Part B (fire, including escape windows and protected routes on two-storey work), Part M (access) and Part P (electrical work). You can go the full-plans route, where drawings are checked before work starts, or a building notice, where inspection happens as you build. Full plans costs a little more time up front and removes most of the risk of being told to undo work.

The Party Wall etc. Act 1996 applies if you build on or at the boundary, cut into a shared wall, or excavate near a neighbour’s foundations. You must serve notice — two months for wall work — and if a neighbour dissents you will need a surveyor. It is not optional and it is not a formality: starting without it can stop the job.

At the end you should receive a completion certificate from building control. Keep it with the planning decision or lawful development certificate; a buyer’s conveyancer will ask for all of it, and reconstructing the paperwork years later is slow and expensive.

What actually protects you on a build this size

An extension is usually the largest single payment a household makes to a contractor. We do not vet the builders who receive your enquiry, so the protection has to come from how you set the job up — and all of it is arranged before work starts, not after something goes wrong.

A written contract

For anything above roughly £20,000, use a proper contract rather than an emailed quote. A homeowner-scale JCT contract sets out the price, the programme, how variations are priced and what happens if either side wants to stop.

Stage payments and retention

Pay against completed milestones, never in advance of work. Holding back around 5% for six to twelve months after completion gives you real leverage on snagging, which is when most disputes actually happen.

Insurance and warranties

Ask for the public liability certificate and check it is current and in the same name as the contract. For larger builds a 10-year structural warranty is worth pricing — and unlike a builder’s own promise, it survives them going out of business.

Three checks worth making before you sign: the company at Companies House (how long trading, any prior dissolutions), the insurance certificate directly with the insurer, and two recent extensions you can actually go and look at. Any builder worth hiring expects all three.

Extension Builders Across 519 UK Towns

Each town page shows local extension builders, town-specific cost ranges and nearby areas.

View all 519 towns โ†’

๐Ÿ›๏ธPlanning permission for House Extension?Check whether your project needs permission before you start — read our 2026 planning guide →

House Extension FAQs

Most single-storey extensions take 10โ€“14 weeks on site once work starts. Double-storey extensions typically take 14โ€“20 weeks. Add 8โ€“12 weeks for planning permission if required, and allow time for builder availability โ€” popular builders are often booked 4โ€“12 weeks in advance. Your matched builder will provide a detailed programme before work begins.
For straightforward extensions under Permitted Development, many builders can work from design-and-build drawings produced in-house or by a draughtsperson rather than a fully qualified architect โ€” which can save cost. Where planning permission is required or the design is complex (e.g. structural alterations, conservation area), engaging an architect is advisable. Your matched builder will recommend the right approach for your project.
Studies consistently show well-built extensions deliver strong ROI in the UK. A single-storey kitchen extension can add 5โ€“8% to property value; a double-storey extension adding a bedroom and bathroom can add 10โ€“20% depending on the area. ROI is highest in markets where the cost of moving is high relative to extension costs โ€” which currently describes most of the UK. A well-matched builder who understands local buyer expectations is key.
A rear extension projects into the garden from the back of the house. A side return extension fills in the narrow alley that runs alongside many Victorian and Edwardian terraced properties, typically 1โ€“2m wide. Combining both creates a wrap-around or L-shaped extension, which is the most common choice for terrace houses looking to maximise kitchen and dining space. Both types can fall under Permitted Development if they meet the relevant criteria.
In most cases, yes. Good extension builders are experienced at working in occupied homes and will protect the rest of the house, maintain access to key rooms and plan the sequence of work to minimise disruption. The most disruptive phase is typically when the existing wall is broken through to connect the extension โ€” this usually takes 1โ€“2 days. Your builder will discuss sequencing with you before work starts.
Always get at least 3 quotes for a project of this size. Extension quotes can vary by 20โ€“40% for the same scope of work, and comparing quotes helps you understand what's included, identify any outliers, and assess each builder's communication and professionalism. BestBuilders provides up to 3 matched quotes from a single form submission โ€” the right number to compare with confidence.
In 2026, single-storey extensions in the UK average ยฃ1,800โ€“ยฃ2,800 per mยฒ for a mid-range finish (excluding VAT and kitchen fit-out), with London projects typically ยฃ2,500โ€“ยฃ3,400 per mยฒ. Our 2026 cost data across 519 UK towns shows the largest variance comes from regional labour rates and ground conditions, not from headline material prices. Get 3 free quotes to see real per-mยฒ figures for your project.
They are separate consents. Planning permission decides whether you can build the extension; Building Regulations check that the construction is safe, weather-tight, energy-efficient and accessible. Many single-storey rear extensions fall under Permitted Development and skip planning, but all extensions still need Building Regulations approval. Apply via your local authority or an Approved Inspector โ€” your builder usually handles submissions. Typical Building Control fees: ยฃ700โ€“ยฃ1,800.
A Party Wall Agreement is required when building work affects a shared wall, structure, or boundary with a neighbouring property. For extensions, this applies if you're excavating within 3m of a neighbour's foundation, building on the boundary line, or cutting into a shared wall. Serve a Party Wall Notice at least 2 months before works start. If your neighbour disagrees, surveyor fees of ยฃ700โ€“ยฃ2,500 per side apply, usually paid by you.
Yes โ€” most UK extension projects are financed through a further advance on your existing mortgage, remortgaging to release equity, or a secured home improvement loan. Typical further-advance rates in 2026 sit around 4.5โ€“6.5%, with arrangement fees of ยฃ300โ€“ยฃ1,000. Lenders usually require build cost quotes, planning evidence and a chartered surveyor valuation showing the post-extension property value. Speak to a mortgage broker familiar with home improvement lending โ€” they often find better rates than going direct.
Standard-rate VAT (20%) applies to most extension work โ€” both labour and materials. A few exceptions reduce VAT: properties that have been empty for 2+ years qualify for a reduced 5% rate; converting non-residential buildings into homes can also qualify; some listed-building adaptations have reduced rates. Builders registered for VAT add it to invoices automatically. Always ask whether quotes include or exclude VAT before comparing.
The snagging period is the time after practical completion when your builder fixes minor defects โ€” cracked plaster, sticking doors, paint touch-ups, sealant gaps. Industry standard is 12 months from completion, with most snags raised in the first 6 weeks once heating cycles have run through the building. Withhold 2.5โ€“5% of the contract value as a retention, released at the end of snagging โ€” this is standard practice and protects you. For jobs over ยฃ40k, consider an independent surveyor for the formal snagging inspection.
After project size, the biggest cost drivers are: (1) Ground conditions โ€” clay, water table, made ground or trees within 5m can add ยฃ8,000โ€“ยฃ25,000 to foundation costs; (2) Glazing โ€” bifolds, sliders and structural glass can swing the budget by ยฃ6,000โ€“ยฃ20,000; (3) Roof type โ€” flat with steel beams vs pitched with tiles. Site access (no rear access) typically adds 10โ€“15%. Kitchen and bathroom fit-out level can double headline cost. To control budget, fix the build envelope first, then adjust fit-out level.
Insurance: tell your home insurer before work starts โ€” they may add an endorsement or require Contractor's All-Risks (CAR) cover during the build. Most builders carry their own public liability and CAR cover, but always check certificates. After completion, update your sum insured to reflect the higher rebuild cost. Council Tax: banding is only reassessed on sale or a "material change" โ€” most extensions don't trigger reassessment for current owners. Adding a self-contained annexe with kitchen and bathroom may.
Best Builders matches homeowners with local extension builders across all 519 UK towns covered by our network โ€” London, the Home Counties, Midlands, North, Scotland and Wales. Each town page shows builders covering your postcode plus typical regional cost ranges. If your postcode falls outside main coverage areas, we'll still send your enquiry to ified builders willing to travel โ€” but availability may be limited.

Question this page didn't answer?

Ask a specific question about your extension project. A member of our editorial team will answer and publish it (your email is never shown).

Free, no-obligation quotes
You decide who to hire
Cost data across 519 UK towns
Always Free for Homeowners
Results in 24 Hours
519+
Towns With Extension Builders
ยฃ22k
Single-Storey From
ยฃ44k
Double-Storey From
ยฃ0
To Get Your Quotes

Complete your project

Homeowners planning house extension often line up these trades too — get free, no-obligation quotes in the same few clicks.

๐Ÿ›๏ธArchitectural ServicesGet free quotes →๐ŸณKitchen RenovationGet free quotes →๐Ÿ”ŒElectrical WorkGet free quotes →

Our sources for this guide

Cost ranges, timelines and regulatory information on this page are compiled from:

Editorial standards & how to reach us

Are you an extension builder? List your business on BestBuilders and receive local extension enquiries.

This page is maintained by the Best Builders editorial team. Cost figures are reviewed quarterly against active quote data from active UK extension quotes. Regulatory information (planning, Building Regs, VAT, Party Wall) is checked against current UK government guidance at each refresh. We do not accept payment for editorial coverage; builder listings are earned through our vetting process, not bought.

If you spot an error, have feedback, or want to suggest content improvements, email editorial@bestbuilders.co.uk.

Last updated: 23 May 2026 · Next scheduled review: 23 August 2026

Reviewed by the BestBuilders editorial team on 1 July 2026 ยท Next scheduled review: October 2026 ยท See our editorial standards.