House Extensions ยท UK-Wide ยท Always Free

House Extension Quotes
From Vetted UK Builders

Compare quotes from FMB and CIOB-qualified extension builders in your area. Single-storey, double-storey and side extensions โ€” up to 3 free quotes in 24 hours, across 519 towns.

  • Every builder verified for insurance, qualifications & reviews
  • Single-storey extensions from ยฃ22,000 nationally
  • Double-storey extensions from ยฃ44,000 nationally
  • Completely free โ€” no obligation to proceed
Get My 3 Free Extension Quotes
Takes 60 seconds ยท No spam ยท No obligation
FMB & CIOB Verified Builders
Minimum ยฃ2m Public Liability
1,200+ Verified Reviews
Always Free for Homeowners
Results in 24 Hours
โœ… Reviewed by the BestBuilders editorial team on 17 June 2026. All cost ranges, brand pricing, regulatory references and step-by-step processes verified against current Q2 2026 UK market data and regulator publications. Editorial standards: /editorial-standards.
519+
Towns With Extension Builders
ยฃ22k
Single-Storey From
ยฃ44k
Double-Storey From
ยฃ0
To Get Your Quotes

How Much Does a House Extension Cost in the UK?

Full cost guide โ†’
Single-Storey Extension
Rear or Side-Return Extension
ยฃ22,000 โ€“ ยฃ67,000

The most popular choice for UK terraces and semis. Adds a kitchen-diner or extra living space at ground level. Typically 3โ€“5m deep, completed in 10โ€“14 weeks.

Get quotes for this โ†’
Double-Storey Extension
Full Double-Storey Rear Extension
ยฃ44,000 โ€“ ยฃ121,000

Maximum space gain in a single build โ€” adds a ground-floor room and a bedroom above. Strong ROI in most UK property markets. Requires full planning permission.

Get quotes for this โ†’
Side Extension
Side-Return or Infill Extension
ยฃ14,500 โ€“ ยฃ50,500

Ideal for terraced homes with a narrow side alley. Transforms a cramped kitchen into a full-width open-plan space. Often combined with a rear extension.

Get quotes for this โ†’
Your Project
Get an Accurate Quote

Costs vary by region, size and specification. Compare 3 quotes from vetted local extension builders for your exact project.

Get free quotes โ†’

Regional pricing note: Extension costs vary significantly by region. London and South East prices are typically 25โ€“40% above the national average due to higher labour costs and stricter planning requirements. Use our local cost guide or enter your postcode above for town-specific ranges.

House Extensions โ€” What You Need to Know

A house extension is one of the most effective ways to add space and value to your UK home without the cost and upheaval of moving. Whether you need a larger kitchen, an extra bedroom, a home office or a new family living space, an extension lets you reshape your home around how you actually live.

The key to a successful extension is choosing the right builder. BestBuilders connects you with FMB and CIOB-qualified extension specialists who understand local planning policies, UK building regulations and the structural demands of different property types โ€” from Victorian terraces to post-war semis.

Every builder in our network is verified for public liability insurance, trade qualifications and genuine customer reviews before they receive a single lead from us.

How we vet builders โ†’

How It Works

1
Tell us your extension type and postcode
Takes 60 seconds. No drawings or plans needed.
2
We match you with extension specialists
Up to 3 vetted builders in your area, within 24 hours.
3
Compare quotes, reviews and timelines
No obligation to proceed with any builder.

Every Extension Builder We List Is:

โœ“ Minimum ยฃ2m public liability insurance โ€” verified before listing
โœ“ Holds relevant trade qualifications (FMB, CIOB)
โœ“ Has a minimum of 5 verified customer reviews before joining
โœ“ Actively monitored โ€” removed for sustained negative feedback

Permitted Development & Planning Permission for House Extensions

๐Ÿก Permitted Development

Many single-storey rear extensions qualify under Permitted Development (PD) rights in England โ€” meaning no formal planning application is required, as long as they stay within size, height and materials limits. PD rights do not apply in Scotland, Wales or Northern Ireland in the same way. Your matched builder will advise on PD eligibility for your specific property.

๐Ÿ“‹ Full Planning Permission

Double-storey extensions, extensions on flats, and properties in conservation areas or with an Article 4 Direction typically require a full planning application. The process takes 8โ€“10 weeks on average. Your builder will advise on what's required for your local authority and can recommend architects who handle extension planning regularly.

๐Ÿ”ง Building Regulations

All extensions โ€” including those under Permitted Development โ€” require Building Regulations approval. This covers structural safety, fire safety, energy efficiency, ventilation and drainage. Building control inspections happen at key stages of the build. Your builder manages this process and provides the completion certificate at the end.

Party Wall Act: If your extension is close to or on the boundary with a neighbouring property, you may need to serve a Party Wall Notice and potentially commission a party wall surveyor. This applies to rear extensions going deeper than 3m (semi-detached) or 6m (detached) under the Neighbour Consultation Scheme. Always check early โ€” the process can add 1โ€“2 months to the pre-construction phase.

House Extension Cost by Region (2026)

Live cost ranges sourced from Best Builders quote data across all 519 UK towns we cover. Figures are mid-range finish; exclude VAT, kitchen and bathroom fit-out, and architectural fees. London prices reflect Zone 1โ€“6 averages.

Region Single-Storey Rear Side Return Double-Storey
Londonยฃ33,000 โ€“ ยฃ67,000ยฃ21,500 โ€“ ยฃ50,500ยฃ67,000 โ€“ ยฃ121,000
South Eastยฃ30,000 โ€“ ยฃ60,000ยฃ19,500 โ€“ ยฃ45,000ยฃ60,000 โ€“ ยฃ108,000
Southernยฃ27,000 โ€“ ยฃ55,000ยฃ17,500 โ€“ ยฃ41,500ยฃ55,000 โ€“ ยฃ99,000
Easternยฃ27,000 โ€“ ยฃ54,000ยฃ17,500 โ€“ ยฃ40,500ยฃ54,000 โ€“ ยฃ97,000
West Midlandsยฃ25,000 โ€“ ยฃ50,000ยฃ16,500 โ€“ ยฃ37,500ยฃ50,000 โ€“ ยฃ90,000
East Midlandsยฃ25,000 โ€“ ยฃ50,000ยฃ16,500 โ€“ ยฃ37,500ยฃ50,000 โ€“ ยฃ90,000
Yorkshireยฃ23,000 โ€“ ยฃ47,000ยฃ15,000 โ€“ ยฃ35,500ยฃ47,000 โ€“ ยฃ85,000
North Westยฃ23,000 โ€“ ยฃ47,000ยฃ15,000 โ€“ ยฃ35,500ยฃ47,000 โ€“ ยฃ85,000
South Westยฃ23,000 โ€“ ยฃ46,000ยฃ15,000 โ€“ ยฃ34,500ยฃ46,000 โ€“ ยฃ83,000
North Eastยฃ22,000 โ€“ ยฃ45,000ยฃ14,500 โ€“ ยฃ34,000ยฃ45,000 โ€“ ยฃ81,000
Scotland (North)ยฃ23,000 โ€“ ยฃ46,000ยฃ15,000 โ€“ ยฃ34,500ยฃ46,000 โ€“ ยฃ82,000
Scotland (South)ยฃ23,000 โ€“ ยฃ46,000ยฃ15,000 โ€“ ยฃ34,500ยฃ46,000 โ€“ ยฃ82,000
South Walesยฃ22,000 โ€“ ยฃ44,000ยฃ14,500 โ€“ ยฃ33,000ยฃ44,000 โ€“ ยฃ79,000
Merseyside & N. Walesยฃ22,000 โ€“ ยฃ44,000ยฃ14,500 โ€“ ยฃ33,000ยฃ44,000 โ€“ ยฃ79,000

Source: Best Builders 2026 Cost Index, aggregated across 519 UK towns. See full cost index โ†’ Ranges reflect mid-spec finishes; premium glazing, structural steel and high-end kitchens move costs above the upper bound. See full cost breakdown โ†’

What Homeowners Say About Our Extension Builders

โ˜…โ˜…โ˜…โ˜…โ˜… 4.8 / 5
โ˜…โ˜…โ˜…โ˜…โ˜…

Got 3 quotes within 24 hours for our single-storey rear extension. All three builders were knowledgeable about local planning rules. The one we chose was brilliant โ€” on time, clean site and the quality is excellent.

Sarah J.
Chorlton, Manchester
House Extension
โ˜…โ˜…โ˜…โ˜…โ˜…

We used BestBuilders to find a builder for our double-storey rear extension. The matching was fast and all three quotes were detailed and professional. Saved thousands compared to quotes I'd got independently.

Raj K.
Wembley, London
Double-Storey Extension
โ˜…โ˜…โ˜…โ˜…โ˜†

Side return extension in our Victorian terrace โ€” a complex job. The builder BestBuilders matched us with had done dozens of similar projects in our area and handled planning, Party Wall and build. Highly recommend.

Emma W.
Islington, London
Side Return Extension

House Extension FAQs

Most single-storey extensions take 10โ€“14 weeks on site once work starts. Double-storey extensions typically take 14โ€“20 weeks. Add 8โ€“12 weeks for planning permission if required, and allow time for builder availability โ€” popular builders are often booked 4โ€“12 weeks in advance. Your matched builder will provide a detailed programme before work begins.
For straightforward extensions under Permitted Development, many builders can work from design-and-build drawings produced in-house or by a draughtsperson rather than a fully qualified architect โ€” which can save cost. Where planning permission is required or the design is complex (e.g. structural alterations, conservation area), engaging an architect is advisable. Your matched builder will recommend the right approach for your project.
Studies consistently show well-built extensions deliver strong ROI in the UK. A single-storey kitchen extension can add 5โ€“8% to property value; a double-storey extension adding a bedroom and bathroom can add 10โ€“20% depending on the area. ROI is highest in markets where the cost of moving is high relative to extension costs โ€” which currently describes most of the UK. A well-matched builder who understands local buyer expectations is key.
A rear extension projects into the garden from the back of the house. A side return extension fills in the narrow alley that runs alongside many Victorian and Edwardian terraced properties, typically 1โ€“2m wide. Combining both creates a wrap-around or L-shaped extension, which is the most common choice for terrace houses looking to maximise kitchen and dining space. Both types can fall under Permitted Development if they meet the relevant criteria.
In most cases, yes. Good extension builders are experienced at working in occupied homes and will protect the rest of the house, maintain access to key rooms and plan the sequence of work to minimise disruption. The most disruptive phase is typically when the existing wall is broken through to connect the extension โ€” this usually takes 1โ€“2 days. Your builder will discuss sequencing with you before work starts.
Always get at least 3 quotes for a project of this size. Extension quotes can vary by 20โ€“40% for the same scope of work, and comparing quotes helps you understand what's included, identify any outliers, and assess each builder's communication and professionalism. BestBuilders provides up to 3 matched quotes from a single form submission โ€” the right number to compare with confidence.
In 2026, single-storey extensions in the UK average ยฃ1,800โ€“ยฃ2,800 per mยฒ for a mid-range finish (excluding VAT and kitchen fit-out), with London projects typically ยฃ2,500โ€“ยฃ3,400 per mยฒ. Our 2026 cost data across 519 UK towns shows the largest variance comes from regional labour rates and ground conditions, not from headline material prices. Get 3 free quotes to see real per-mยฒ figures for your project.
They are separate consents. Planning permission decides whether you can build the extension; Building Regulations check that the construction is safe, weather-tight, energy-efficient and accessible. Many single-storey rear extensions fall under Permitted Development and skip planning, but all extensions still need Building Regulations approval. Apply via your local authority or an Approved Inspector โ€” your builder usually handles submissions. Typical Building Control fees: ยฃ700โ€“ยฃ1,800.
A Party Wall Agreement is required when building work affects a shared wall, structure, or boundary with a neighbouring property. For extensions, this applies if you're excavating within 3m of a neighbour's foundation, building on the boundary line, or cutting into a shared wall. Serve a Party Wall Notice at least 2 months before works start. If your neighbour disagrees, surveyor fees of ยฃ700โ€“ยฃ2,500 per side apply, usually paid by you.
Yes โ€” most UK extension projects are financed through a further advance on your existing mortgage, remortgaging to release equity, or a secured home improvement loan. Typical further-advance rates in 2026 sit around 4.5โ€“6.5%, with arrangement fees of ยฃ300โ€“ยฃ1,000. Lenders usually require build cost quotes, planning evidence and a chartered surveyor valuation showing the post-extension property value. Speak to a mortgage broker familiar with home improvement lending โ€” they often find better rates than going direct.
Standard-rate VAT (20%) applies to most extension work โ€” both labour and materials. A few exceptions reduce VAT: properties that have been empty for 2+ years qualify for a reduced 5% rate; converting non-residential buildings into homes can also qualify; some listed-building adaptations have reduced rates. Builders registered for VAT add it to invoices automatically. Always ask whether quotes include or exclude VAT before comparing.
The snagging period is the time after practical completion when your builder fixes minor defects โ€” cracked plaster, sticking doors, paint touch-ups, sealant gaps. Industry standard is 12 months from completion, with most snags raised in the first 6 weeks once heating cycles have run through the building. Withhold 2.5โ€“5% of the contract value as a retention, released at the end of snagging โ€” this is standard practice and protects you. For jobs over ยฃ40k, consider an independent surveyor for the formal snagging inspection.
After project size, the biggest cost drivers are: (1) Ground conditions โ€” clay, water table, made ground or trees within 5m can add ยฃ8,000โ€“ยฃ25,000 to foundation costs; (2) Glazing โ€” bifolds, sliders and structural glass can swing the budget by ยฃ6,000โ€“ยฃ20,000; (3) Roof type โ€” flat with steel beams vs pitched with tiles. Site access (no rear access) typically adds 10โ€“15%. Kitchen and bathroom fit-out level can double headline cost. To control budget, fix the build envelope first, then adjust fit-out level.
Insurance: tell your home insurer before work starts โ€” they may add an endorsement or require Contractor's All-Risks (CAR) cover during the build. Most builders carry their own public liability and CAR cover, but always check certificates. After completion, update your sum insured to reflect the higher rebuild cost. Council Tax: banding is only reassessed on sale or a "material change" โ€” most extensions don't trigger reassessment for current owners. Adding a self-contained annexe with kitchen and bathroom may.
Best Builders matches homeowners with vetted, insured extension builders across all 519 UK towns covered by our network โ€” London, the Home Counties, Midlands, North, Scotland and Wales. Each town page shows the verified builders local to your postcode plus typical regional cost ranges. If your postcode falls outside main coverage areas, we'll still send your enquiry to qualified builders willing to travel โ€” but availability may be limited.

Our sources for this guide

Cost ranges, timelines and regulatory information on this page are compiled from:

Editorial standards & how to reach us

This page is maintained by the Best Builders editorial team. Cost figures are reviewed quarterly against active quote data from our verified UK builder network. Regulatory information (planning, Building Regs, VAT, Party Wall) is checked against current UK government guidance at each refresh. We do not accept payment for editorial coverage; builder listings are earned through our vetting process, not bought.

If you spot an error, have feedback, or want to suggest content improvements, email editorial@bestbuilders.co.uk.

Last updated: 23 May 2026 · Next scheduled review: 23 August 2026

Extension Builders Across 519 UK Towns

Each town page shows local extension builders, town-specific cost ranges and nearby areas.

View all 519 towns โ†’

Get Free House Extension Quotes Today

Tell us your extension type and postcode โ€” we'll match you with up to 3 vetted local extension builders within 24 hours. Free, no-obligation, no spam.