๐Ÿงฎ Interactive Calculator ยท April 2026

Rewiring Cost Calculator UK

Get a 2026 UK rewiring cost estimate in 30 seconds. Full or partial rewire, EICR test, fuse box upgrade. NICEIC/NAPIT certified electrician rates including Part P notification.

โšก
Full + partial + EICR
๐Ÿ“…
Updated June 2026
๐Ÿ”ง
NICEIC certified rates
๐Ÿ†“
Free ยท no email

Estimate Your Rewiring Cost in 30 Seconds

5 steps. Includes wiring, sockets, switches, consumer unit, Part P certification, NICEIC/NAPIT registration, VAT.

Rewiring Calculator Questions

How accurate is this calculator?

Mid figure matches NICEIC certified electrician rate averages for 2024-2025. Variance ยฑ18% reflects real quote spread.

When does a house need rewiring?

Most UK homes need rewiring every 25-30 years. Signs: rubber-insulated cables, fuse box, 2-pin sockets, no RCD protection, frequent tripping.

What is Part P certification?

Building Regulations Part P covers electrical safety. Notifiable work must be certified by a registered electrician (NICEIC, NAPIT, ELECSA).

How long does a rewire take?

1-bed flat: 3-5 days. 3-bed semi: 5-10 days. 4-bed detached: 7-14 days. Add 20-30% if occupied.

Get Free House Rewiring Quotes from NICEIC-Approved Electricians

BestBuilders matches you with up to 3 NICEIC-approved local electricians. Compare real prices, check reviews, and hire with confidence โ€” all for free.

Get My 3 Free Rewiring Quotes
Takes 60 seconds ยท No spam ยท No obligation