Dormer Loft Conversion Cost Calculator
A dormer buys you full head height across the new room, which is why it is the default choice on a terrace or semi. It is also the point at which the roof structure changes, so the price step from a Velux conversion is real.
Open the calculator →Price your dormer in 30 seconds
4 steps. Dormer size, staircase route, en-suite and region.
How this calculator works
A dormer replaces part of the sloping roof with a vertical wall and a flat roof above it. That is what gives you full head height across the room, and it is also why the price step from a Velux conversion is a structural one rather than a finish one.
Size is the main lever, and it is not linear โ a full-width dormer is not twice a single one, because the scaffolding, the steels and the roof covering all scale differently from the fit-out.
On planning: permitted development is a volume allowance for the whole house, not per project. If a previous owner already dormered or extended, some of it is gone โ a Lawful Development Certificate is the way to be sure.
Dormer loft conversion cost by type (2026)
| Option | Typical 2026 cost | Notes |
|---|---|---|
| Single rear dormer | ยฃ30,000โยฃ45,000 | One box over part of the roof |
| Double / full-width dormer | ยฃ45,000โยฃ65,000 | The whole rear roof |
| Dormer plus hip-to-gable | ยฃ50,000โยฃ70,000 | Semi or end-terrace |
| Cost per mยฒ (dormer spec) | ยฃ1,500โยฃ2,500 | Above Velux, below mansard |
| Flat-roof dormer, single | ยฃ18,000โยฃ28,000 | Where the dormer is the whole job |
| Winder or quarter-turn stair | +ยฃ2,000โยฃ4,000 | Where the landing is tight |
| En-suite, stack reachable | +ยฃ4,000โยฃ7,000 | Rises sharply if it is not |
Figures match our dormer loft conversion cost guide and flat-roof dormer costs.
Dormer loft conversion calculator FAQs
Usually, within the volume allowance โ 40mยณ on a terrace, 50mยณ on a semi or detached house, measured across the whole roof and reduced by anything already built. Front-facing dormers on the principal elevation are not. Check our dormer planning guide.
Because the whole rear roof comes off rather than part of it. That means more steel, a bigger flat roof, more scaffolding time and usually two rooms fitted out instead of one.
Flat is cheaper and gives more internal height, which is why most rear dormers are flat. A pitched dormer looks better from the street and is often what a conservation area officer will want.
Ten to twelve weeks on site is typical. The roof is open under a temporary cover for part of it, so a winter build carries more weather risk.
Related cost guides
- Loft conversion costs โ every type priced
- Planning permission โ the PD volume limits
- Loft conversion quotes โ 3 free quotes