Costs ยท Updated June 2026

How Much Does a Dormer Window Cost in 2026? (UK)

A dormer window in the UK costs roughly ยฃ4,000โ€“ยฃ12,000 supplied and fitted in 2026 for the dormer box on its own โ€” or ยฃ40,000โ€“ยฃ75,000 when it forms part of a full dormer loft conversion with stairs, insulation and a finished room. The big cost drivers are roof type (flat-roof dormers are cheapest), size and number of windows, structural steelwork, and the internal finish. This guide breaks down every line of the price and where you can safely save.

Price by dormer size Box only vs full conversion What affects the price
โœ… Vetted UK Loft & Dormer Specialists
๐Ÿ’ฌ 1,900+ Verified Reviews
๐Ÿ›ก Minimum ยฃ2m Public Liability
๐Ÿ†“ Always Free for Homeowners

Dormer Window Cost by Size (2026)

Supplied and fitted, including structure, roofing, glazing and making good โ€” on a standard pitched roof.

Dormer typeDormer box onlyAs full loft conversion
Single flat-roof dormer (small)ยฃ4,000โ€“ยฃ7,000ยฃ40,000โ€“ยฃ55,000
Standard rear dormerยฃ6,000โ€“ยฃ12,000ยฃ50,000โ€“ยฃ65,000
Large or full-width dormerยฃ12,000โ€“ยฃ20,000ยฃ60,000โ€“ยฃ75,000

Rule of thumb in 2026: the dormer structure costs roughly ยฃ1,500โ€“ยฃ2,500/mยฒ of added floor area; the finished room as a whole runs ยฃ2,000โ€“ยฃ3,000/mยฒ.

Where the Money Goes

  • Design & structural calcs (ยฃ800โ€“ยฃ2,500). Drawings plus a structural engineer for the steel beams that carry the new opening.
  • Scaffolding (ยฃ800โ€“ยฃ1,800). Needed for safe roof access and usually hired for the full build period.
  • Strip & structural opening (ยฃ1,500โ€“ยฃ4,000). Cutting the roof, fitting steels and forming the dormer frame is the core of the box cost.
  • Roofing & cladding (ยฃ1,500โ€“ยฃ4,000). Flat-roof felt/EPDM or tiled cheeks, lead flashing and weatherproofing.
  • Windows & glazing (ยฃ600โ€“ยฃ2,500). Double-glazed casements or full-width glazing; rooflights are cheaper than dormer glazing.
  • Internal fit-out (ยฃ8,000โ€“ยฃ25,000+, conversion only). Stairs, insulation, plasterboard, electrics, heating and a building-regs sign-off turn the box into a usable room.

Get Free Dormer & Loft Quotes

BestBuilders matches you with up to 3 vetted UK loft and dormer specialists โ€” compare prices for a dormer box or a full loft conversion side by side.

Get My 3 Free Dormer Quotes
Takes 60 seconds ยท No spam ยท No obligation

Common Questions

Expect ยฃ4,000โ€“ยฃ12,000 supplied and fitted for the dormer box itself, depending on size, roof type and glazing. A large or full-width dormer can reach ยฃ20,000 before any internal fit-out.
Yes โ€” adding only the dormer box is far cheaper than a complete conversion, because you avoid stairs, insulation, electrics and building-regs fit-out. But a dormer on its own does not create a habitable room; most homeowners add it as part of a ยฃ40,000โ€“ยฃ75,000 conversion.
A rear dormer is often permitted development within the 40m³ (terraced) or 50m³ (semi/detached) volume limit, but a dormer on the front or principal elevation facing a highway almost always needs full planning permission.
Roof type and size are the biggest factors โ€” a flat-roof rear dormer is cheapest, while pitched or full-width dormers cost more in structure and roofing. Steelwork, access, glazing spec and finish all add to the price.
The dormer box itself is typically 2โ€“4 weeks once scaffolding is up. As part of a full loft conversion, budget 6โ€“10 weeks all-in for structure, fit-out and building-regs sign-off.

Related Guides

More loft and dormer cost and planning guides.

Dormer Planning Permission 2026

When a dormer needs planning permission.

Read Guide โ†’

All Cost Guides

Honest 2026 pricing for every home improvement job.

Browse Costs โ†’

Get 3 Free Dormer Quotes

Tell us your postcode. We'll match you with up to 3 vetted loft and dormer specialists in 24 hours โ€” free, no obligation.