Concrete Removal Cost Calculator
Concrete is two costs: breaking it out, and getting it away. This prices both, and shows why a grab lorry usually beats a skip.
Open the calculator →Price your concrete removal in 30 seconds
4 steps. Area, thickness, how it leaves site and region.
How this calculator works
Concrete removal is two jobs priced as one. Breaking out is labour and machine time, driven by thickness and whether there is rebar in it. Getting it away is driven by weight, which is a different constraint entirely.
That is why the removal method matters. A skip is priced by volume but capped by weight, so a skip of concrete hits the limit well below the rim and adds ยฃ50โยฃ150. A grab lorry is built for dense waste and takes it in one lift.
The option people miss is crushing it on site. If a new base is going down in the same place, the old slab can often become the hardcore under it โ which removes the disposal cost and the aggregate cost together.
Concrete removal cost (2026)
| Job | Typical 2026 cost | Notes |
|---|---|---|
| Break out slab, up to 100mm | ยฃ45โยฃ60 per mยฒ | Breaker and labour |
| Break out slab, 100โ200mm | ยฃ60โยฃ80 per mยฒ | Slower going |
| Reinforced concrete | ยฃ75โยฃ90 per mยฒ | Rebar cut out as you go |
| Concrete driveway (20โ30 mยฒ) | ยฃ900โยฃ2,400 | Typical whole-driveway job |
| Grab lorry, per load away | ยฃ180โยฃ350 | Cheapest route for hardcore |
| Skip with heavy rubble | ยฃ245โยฃ600 +ยฃ50โยฃ150 | Overweight surcharge usually applies |
| Mini digger + breaker hire | ยฃ180โยฃ350 per day | Beats labour beyond ~30 mยฒ |
Figures match our concrete removal cost guide.
Concrete removal calculator FAQs
Skips are priced by volume but limited by weight. Concrete hits the weight limit long before the skip is full, adding a ยฃ50โยฃ150 overweight charge. A grab lorry is designed for dense waste.
Beyond roughly 30 mยฒ, machine hire at ยฃ180โยฃ350 a day usually costs less than the extra labour. Below that a hand breaker is quicker to set up.
Often โ crushed as hardcore under a new base, which saves the removal cost and the aggregate cost. Worth asking if you are relaying in the same place.
Removing it, no. Replacing it with non-permeable surfacing over 5 mยฒ usually needs planning permission or a drainage solution โ check before you commit to the replacement.
Related cost guides
- Concrete removal guide โ breaking out and muck away
- Waste options โ skip vs grab vs wait-and-load
- Driveway costs โ what goes back in its place
Get 3 free concrete removal quotes
60 seconds · No spam · No obligation