Concrete Removal Cost Calculator

Concrete is two costs: breaking it out, and getting it away. This prices both, and shows why a grab lorry usually beats a skip.

Open the calculator →
Priced per mยฒ
Grab vs skip compared
Machine hire threshold
100% free ยท No signup

Price your concrete removal in 30 seconds

4 steps. Area, thickness, how it leaves site and region.

How this calculator works

Concrete removal is two jobs priced as one. Breaking out is labour and machine time, driven by thickness and whether there is rebar in it. Getting it away is driven by weight, which is a different constraint entirely.

That is why the removal method matters. A skip is priced by volume but capped by weight, so a skip of concrete hits the limit well below the rim and adds ยฃ50โ€“ยฃ150. A grab lorry is built for dense waste and takes it in one lift.

The option people miss is crushing it on site. If a new base is going down in the same place, the old slab can often become the hardcore under it โ€” which removes the disposal cost and the aggregate cost together.

Concrete removal cost (2026)

JobTypical 2026 costNotes
Break out slab, up to 100mmยฃ45โ€“ยฃ60 per mยฒBreaker and labour
Break out slab, 100โ€“200mmยฃ60โ€“ยฃ80 per mยฒSlower going
Reinforced concreteยฃ75โ€“ยฃ90 per mยฒRebar cut out as you go
Concrete driveway (20โ€“30 mยฒ)ยฃ900โ€“ยฃ2,400Typical whole-driveway job
Grab lorry, per load awayยฃ180โ€“ยฃ350Cheapest route for hardcore
Skip with heavy rubbleยฃ245โ€“ยฃ600 +ยฃ50โ€“ยฃ150Overweight surcharge usually applies
Mini digger + breaker hireยฃ180โ€“ยฃ350 per dayBeats labour beyond ~30 mยฒ

Figures match our concrete removal cost guide.

Concrete removal calculator FAQs

Skips are priced by volume but limited by weight. Concrete hits the weight limit long before the skip is full, adding a ยฃ50โ€“ยฃ150 overweight charge. A grab lorry is designed for dense waste.

Beyond roughly 30 mยฒ, machine hire at ยฃ180โ€“ยฃ350 a day usually costs less than the extra labour. Below that a hand breaker is quicker to set up.

Often โ€” crushed as hardcore under a new base, which saves the removal cost and the aggregate cost. Worth asking if you are relaying in the same place.

Removing it, no. Replacing it with non-permeable surfacing over 5 mยฒ usually needs planning permission or a drainage solution โ€” check before you commit to the replacement.