Wet Room Cost Calculator

Wet rooms are priced by what happens under the tiles, not on top of them. This prices the tanking, the fall and the floor build-up that quotes usually bury.

Open the calculator →
Tanking priced properly
Falls and floor build-up
Timber vs concrete floors
100% free ยท No signup

Price your wet room in 30 seconds

5 steps. Size, spec, floor structure, drainage and region.

How this calculator works

A wet room is a waterproofing job with a bathroom on top. The tanking membrane, the fall to the drain and the floor build-up are what separate a wet room that lasts twenty years from one that marks the ceiling below within two.

That is why the floor question matters most. On concrete the fall is cut into screed. On timber joists it usually means notching or dropping the deck, and upstairs over a finished room there is least space to do it and most to lose.

On certification: bathroom electrics are notifiable under Part P. We do not verify that for you โ€” ask who is certifying the electrical work and get the certificate before you pay the final invoice.

Wet room cost by size and spec (2026)

Wet room typeTypical 2026 costNotes
Cloakroom / small en-suite (2โ€“3 mยฒ)ยฃ3,800โ€“ยฃ6,500Shower only, compact layout
Standard family bathroom (4โ€“6 mยฒ)ยฃ6,500โ€“ยฃ14,000The most common conversion
Large / master wet room (7โ€“10 mยฒ)ยฃ9,500โ€“ยฃ19,000Often twin drainage
Accessible / level-access (4โ€“6 mยฒ)ยฃ5,500โ€“ยฃ13,000Grants may cover part of it
Tanking / waterproof membraneยฃ600โ€“ยฃ1,500Room size; liquid vs sheet
Sloped former or screed-to-fallยฃ250โ€“ยฃ700Pre-formed tray vs hand-cut screed
Floor structure alterationsยฃ0โ€“ยฃ1,800Timber joists often need notching

Figures match our wet room cost guide. Bathroom electrics are notifiable under Part P โ€” ask who is certifying.

Wet room calculator FAQs

Because the whole floor becomes the shower tray. Tanking, a fall to the drain and often structural work to the floor are all needed before a single tile goes down.

Most can, but timber floors upstairs are the constraint โ€” you need enough depth to create the fall without weakening the joists. An installer who does not ask about the floor has not priced it.

Not usually for the waterproofing itself, but moving the soil stack often needs building control, and the electrics are notifiable under Part P either way.

Eight to fourteen days for a small one, up to sixteen for a large or luxury build. Tanking and screed both need drying time that cannot be rushed.