Bathroom Plumbing Cost Calculator

Bathroom plumbing is priced by what moves. This separates a like-for-like swap from a layout change, because the gap between them is thousands.

Open the calculator →
First and second fix
Soil stack priced
Part P explained
100% free ยท No signup

Price your plumbing in 30 seconds

4 steps. What moves, the soil stack, extra fittings and region.

How this calculator works

Supply pipes can go almost anywhere. Waste cannot โ€” it runs on gravity, so every WC, bath and shower needs a fall to the stack. That single fact explains most of the spread between a ยฃ900 bathroom and a ยฃ4,000 one.

Keeping the WC where it is, even if everything else moves, usually keeps you in the lower half of the range. Moving it means new waste at the right gradient, often notching or boxing joists, and sometimes relocating the stack itself.

On certification: the plumbing itself is not notifiable, but bathroom electrics are, under Part P. Ask which trade is certifying what, and get the paperwork.

The estimate hinges almost entirely on one answer: whether the WC, and therefore the soil stack, stays put. Keep it in place and you sit in the lower half of the range; move it and you are paying for new waste runs at the correct fall, joist work and often building control. That same gravity drainage is what makes a wet room conversion more involved than a standard refit. Timing matters too: second fix only happens once the walls are tiled, so it pays to line the plumber up around the tiling schedule rather than treat the two as separate jobs.

Bathroom plumbing cost by job (2026)

JobTypical 2026 costNotes
Plumbing first & second fix (full bathroom)ยฃ900โ€“ยฃ2,200Moving the soil stack is the big driver
Replace toilet, like for likeยฃ150โ€“ยฃ350Plus the unit
Replace shower valve or mixerยฃ150โ€“ยฃ350Plus the valve
Waste re-route / new drain runยฃ200โ€“ยฃ700Joist direction and available drop decide it
Move the soil stackยฃ800โ€“ยฃ2,000+Structural; often needs building control
Plumber call-out / first hourยฃ60โ€“ยฃ120London at the top of the range
Additional hourly rateยฃ45โ€“ยฃ90Half-day and day rates often cheaper
Electrics, extractor & lightingยฃ450โ€“ยฃ1,200Separate trade; notifiable under Part P

Figures match our bathroom plumbing cost guide. Bathroom electrics are notifiable under Part P โ€” ask who is certifying.

Bathroom plumbing calculator FAQs

Waste runs on gravity and needs a fall to the stack. Moving a WC means new waste runs at the right gradient, often notching joists, and sometimes relocating the stack โ€” ยฃ800โ€“ยฃ2,000+ against ยฃ150โ€“ยฃ350 for a like-for-like swap.

First fix is the pipework buried before plastering. Second fix is hanging the taps, shower, WC and basin after tiling. A single quoted figure should still itemise both.

The plumbing itself is not, but bathroom electrics are notifiable under Part P, and any gas appliance work is legally Gas Safe. Ask who is certifying which part before work starts.

If it is lead, or plastic push-fit of unknown age, yes. It is far cheaper now than after the tiling is done, and it is the one decision people most often regret skipping.

Get 3 free bathroom plumbing quotes

60 seconds · No spam · No obligation