Bathroom Plumbing Cost Calculator
Bathroom plumbing is priced by what moves. This separates a like-for-like swap from a layout change, because the gap between them is thousands.
Open the calculator →Price your plumbing in 30 seconds
4 steps. What moves, the soil stack, extra fittings and region.
How this calculator works
Supply pipes can go almost anywhere. Waste cannot โ it runs on gravity, so every WC, bath and shower needs a fall to the stack. That single fact explains most of the spread between a ยฃ900 bathroom and a ยฃ4,000 one.
Keeping the WC where it is, even if everything else moves, usually keeps you in the lower half of the range. Moving it means new waste at the right gradient, often notching or boxing joists, and sometimes relocating the stack itself.
On certification: the plumbing itself is not notifiable, but bathroom electrics are, under Part P. Ask which trade is certifying what, and get the paperwork.
Bathroom plumbing cost by job (2026)
| Job | Typical 2026 cost | Notes |
|---|---|---|
| Plumbing first & second fix (full bathroom) | ยฃ900โยฃ2,200 | Moving the soil stack is the big driver |
| Replace toilet, like for like | ยฃ150โยฃ350 | Plus the unit |
| Replace shower valve or mixer | ยฃ150โยฃ350 | Plus the valve |
| Waste re-route / new drain run | ยฃ200โยฃ700 | Joist direction and available drop decide it |
| Move the soil stack | ยฃ800โยฃ2,000+ | Structural; often needs building control |
| Plumber call-out / first hour | ยฃ60โยฃ120 | London at the top of the range |
| Additional hourly rate | ยฃ45โยฃ90 | Half-day and day rates often cheaper |
| Electrics, extractor & lighting | ยฃ450โยฃ1,200 | Separate trade; notifiable under Part P |
Figures match our bathroom plumbing cost guide. Bathroom electrics are notifiable under Part P โ ask who is certifying.
Bathroom plumbing calculator FAQs
Waste runs on gravity and needs a fall to the stack. Moving a WC means new waste runs at the right gradient, often notching joists, and sometimes relocating the stack โ ยฃ800โยฃ2,000+ against ยฃ150โยฃ350 for a like-for-like swap.
First fix is the pipework buried before plastering. Second fix is hanging the taps, shower, WC and basin after tiling. A single quoted figure should still itemise both.
The plumbing itself is not, but bathroom electrics are notifiable under Part P, and any gas appliance work is legally Gas Safe. Ask who is certifying which part before work starts.
If it is lead, or plastic push-fit of unknown age, yes. It is far cheaper now than after the tiling is done, and it is the one decision people most often regret skipping.
Related cost guides
- Plumbing cost guide โ every job priced
- Full bathroom costs โ where plumbing sits in the total
- Bathroom repairs โ when it is a fault, not a refit
Get 3 free bathroom plumbing quotes
60 seconds · No spam · No obligation