Flooring Cost Calculator

Flooring is priced per square metre, and the fitting labour is often a third of the bill. In Q3 2026 laminate runs about ยฃ18–ยฃ35/m² supplied and fitted, LVT ยฃ35–ยฃ70/m², engineered wood ยฃ45–ยฃ95/m² and carpet ยฃ15–ยฃ40/m². Subfloor preparation is the mostโ€ฆ

Open the calculator →
From our published figures
Regional rates applied
30 seconds
100% free ยท No signup

Price flooring in 30 seconds

2 steps, using the figures from our cost guide.

How this calculator works

Every figure in this calculator is the one published in the cost table on our flooring guide. Pick the option that matches your job and the calculator returns that published range, adjusted for your region - it does not model anything the guide does not already say.

That is deliberate. A calculator whose rates drift from the page it sits under is worse than no calculator, because two numbers on the same site disagree.

What it cannot know: access, the condition of what is already there, and anything structural. Those are what separate three real quotes from each other.

Published flooring costs (2026)

OptionTypical 2026 costNotes
Amticoยฃ35โ€“ยฃ85
Eggerยฃ12โ€“ยฃ30
Karndeanยฃ30โ€“ยฃ70
Moduleoยฃ25โ€“ยฃ55
Quick-Stepยฃ18โ€“ยฃ45
Ted Toddยฃ60โ€“ยฃ150

These are the figures from our flooring cost guide.

Flooring calculator โ€” FAQs

For a typical 3-bed semi with around 90–110 m² of floor area, budget roughly £2,500–£4,500 for laminate throughout, £3,500–£7,000 for LVT and £5,000–£10,000 for engineered wood, all supplied and fitted. Mixing carpet upstairs with a hard floor downstairs is usually the cheapest whole-house route.

Only if it is out of tolerance. Most fitters check with a straight edge and will latex-level if there is more than about 3 mm of deviation over 2 m. Self-levelling compound typically adds £8–£18/m², and it is the single most common extra on a flooring quote.

Sometimes, but not always — many fitters buy at trade prices you cannot access, and if you supply the material they will not warrant it against defects. If you do supply your own, order 7–10% extra for cuts and wastage.

One average room takes a day. A whole ground floor is usually 2–3 days, plus a day beforehand if levelling is needed and the compound has to cure.