How much do architects charge in 2026? UK fees explained
Most UK architects charge 7% to 15% of the build cost for a full domestic service in 2026, a fixed fee for defined stages, or ยฃ70 to ยฃ160 an hour for ad hoc work. The percentage sounds alarming until you see it split across the RIBA work stages โ and realise you probably do not need all of them. This guide breaks down every fee model, stage by stage, with worked examples.
- Full service: 7โ15% of build cost
- Planning drawings only: ยฃ1,200 โ ยฃ4,000 typical
- Hourly rate: ยฃ70 โ ยฃ160 depending on seniority and region
Get 3 Free Architect Fee Proposals
Compare written fee proposals from vetted UK architects and architectural designers for your project.
- ✓ Vetted architects and designers
- ✓ Stage-by-stage fee breakdowns
- ✓ Free, no-obligation proposals
The three fee models
Architects price work in one of three ways, and most practices combine them: a fixed fee for the uncertain early stages, then a percentage once the build cost is established.
| Model | Typical 2026 rate | Best suited to |
|---|---|---|
| Percentage of build cost | 7% โ 15% | Full service, from concept through to site inspections |
| Fixed fee | ยฃ1,200 โ ยฃ25,000+ | A clearly defined scope, such as planning plus building regs |
| Hourly rate | ยฃ70 โ ยฃ160 per hour | Feasibility advice, appeals, one-off input |
| Day rate | ยฃ500 โ ยฃ1,200 per day | Site attendance, workshops, planning meetings |
Hourly rates vary by seniority โ a technician or Part 2 assistant will be at the bottom of the range, a director or sole practitioner with 20 years of local planning experience at the top. London and the South East typically sit 20โ30% above national rates.
Percentage fees by project value
The percentage falls as project value rises, because the fixed overhead of running a project does not scale proportionally. Small jobs are proportionally expensive.
| Build cost | Typical full-service fee | Approximate fee in pounds |
|---|---|---|
| Under ยฃ50,000 | 12% โ 15% | ยฃ6,000 โ ยฃ7,500 |
| ยฃ50,000 โ ยฃ100,000 | 10% โ 13% | ยฃ5,000 โ ยฃ13,000 |
| ยฃ100,000 โ ยฃ250,000 | 9% โ 12% | ยฃ9,000 โ ยฃ30,000 |
| ยฃ250,000 โ ยฃ500,000 | 8% โ 11% | ยฃ20,000 โ ยฃ55,000 |
| Over ยฃ500,000 | 7% โ 10% | ยฃ35,000+ |
Watch what "build cost" means
A percentage fee is charged against the construction cost, and the definition matters. Confirm in writing whether it includes VAT, professional fees, fittings, landscaping and contingency, and โ importantly โ whether the fee is recalculated if the build cost rises during the project. Anchoring the fee to a fixed figure agreed at tender protects you from paying more simply because material prices moved.
Fees by RIBA work stage
This is the most useful table on the page. The percentages below are the typical share of the total fee attributable to each stage โ which is how you work out the cost of buying only part of the service.
| RIBA stage | What you get | Share of total fee | On a ยฃ150,000 build |
|---|---|---|---|
| 0โ1 Preparation and brief | Brief, budget, feasibility, survey coordination | 5% โ 10% | ยฃ800 โ ยฃ1,650 |
| 2 Concept design | Sketch options, spatial layout, initial planning advice | 15% โ 20% | ยฃ2,500 โ ยฃ3,300 |
| 3 Spatial coordination | Developed design and the planning application | 15% โ 20% | ยฃ2,500 โ ยฃ3,300 |
| 4 Technical design | Building regs package, construction drawings, specification | 25% โ 30% | ยฃ4,100 โ ยฃ5,000 |
| 5 Construction | Tender support, contract administration, site inspections | 25% โ 30% | ยฃ4,100 โ ยฃ5,000 |
| 6โ7 Handover and use | Completion, snagging, final certificates | 2% โ 5% | ยฃ300 โ ยฃ800 |
Worked example: a ยฃ150,000 extension at an 11% full-service fee is around ยฃ16,500. Stopping after stage 4 โ planning approved and a full building regulations package in hand, then running the build yourself โ costs roughly ยฃ10,000 to ยฃ11,500 of that. Many homeowners take exactly this route.
Typical fixed fees for common domestic projects
| Project | Planning drawings only | Planning + building regs |
|---|---|---|
| Single-storey rear extension | ยฃ1,200 โ ยฃ2,400 | ยฃ2,200 โ ยฃ4,500 |
| Two-storey side extension | ยฃ1,800 โ ยฃ3,200 | ยฃ3,200 โ ยฃ6,000 |
| Loft conversion | ยฃ1,000 โ ยฃ2,200 | ยฃ2,000 โ ยฃ4,000 |
| Whole-house remodel | ยฃ2,500 โ ยฃ5,500 | ยฃ5,000 โ ยฃ12,000 |
| New build house | ยฃ4,000 โ ยฃ9,000 | ยฃ8,000 โ ยฃ20,000+ |
| Listed building or conservation area work | Add 25% โ 50% | Heritage statements and extra consultation |
Cheaper alternatives worth considering
An ARB-registered architect is not the only route to a set of drawings, and for many straightforward projects it is not the best-value one. Two other roles do overlapping work:
- Architectural technologist โ specialists in technical design, construction detailing and Building Regulations compliance, often qualified through CIAT. Typically 25โ40% cheaper than a registered architect for the same drawing package. Ideal for extensions, loft and garage conversions where the layout is already broadly settled and the challenge is making it buildable and compliant.
- Architectural designer or draughtsperson โ produces planning and building regs drawings for straightforward schemes. Often 40โ60% cheaper. Note that these titles are not legally protected, so check portfolio, professional indemnity insurance and references carefully.
- Design-and-build contractor โ some builders include design in the package. Convenient and cheap, but the designer works for the builder, not for you, which weakens your position if a dispute arises.
For more on which of these roles suits your project, and how to verify credentials, see our guide to choosing an architect in the UK.
Costs that are not in the architect's fee
Fee proposals almost always exclude these. Budget for them separately:
- Planning application fee: paid to the local authority, set nationally and revised periodically
- Building Control fees: local authority or approved inspector
- Structural engineer: ยฃ600 โ ยฃ2,000 for a typical domestic project
- Measured survey: ยฃ400 โ ยฃ1,200 depending on property size
- Specialist reports: arboricultural, ecology, flood risk, heritage โ ยฃ400 โ ยฃ1,500 each where required
- Party wall surveyor: ยฃ900 โ ยฃ2,000 per neighbour where an award is needed
- VAT: check whether quoted fees include it
How to keep the fee down
- Be clear and honest about your budget at the first meeting โ designing something unaffordable is the most expensive mistake in the process
- Buy stages 0 to 4 and manage the construction yourself if you are confident doing so
- Reduce revision rounds by giving decisive feedback rather than incremental changes
- Get three written fee proposals and compare stage inclusions, not just headline totals
- Match the professional to the project โ a technologist for a simple extension is not a compromise, it is the right appointment
FAQs: architect fees (UK, 2026)
How much do architects charge in 2026?
UK architects typically charge 7% to 15% of the build cost for a full service in 2026, with smaller projects at the higher end. Fixed fees run from about ยฃ1,200 for simple planning drawings to ยฃ25,000 or more for a full new build service, and hourly rates are generally ยฃ70 to ยฃ160.
What percentage of build cost do architects charge?
Around 12% to 15% on projects under ยฃ50,000, 9% to 12% between ยฃ100,000 and ยฃ250,000, and 7% to 10% above ยฃ500,000. The percentage falls as the project value rises because the fixed cost of running a project does not scale proportionally.
How much does an architect charge for planning drawings only?
For a single-storey rear extension expect roughly ยฃ1,200 to ยฃ2,400 for planning drawings alone, or ยฃ2,200 to ยฃ4,500 for planning plus a building regulations package. A loft conversion is usually a little less and a whole-house remodel considerably more.
Is an architectural technologist cheaper than an architect?
Yes, typically 25% to 40% cheaper for an equivalent drawing package. Architectural technologists specialise in technical design and Building Regulations compliance, which makes them very good value on extensions and conversions where the layout is already broadly decided.
What is not included in an architect's fee?
Planning application and Building Control fees, structural engineering, measured surveys, specialist reports such as ecology or heritage statements, party wall surveyors and often VAT are all normally excluded. Ask for a written list of exclusions before you appoint.