Single vs Double Storey Extension: 2026 UK Cost Comparison
Single storey ยฃ30,000โยฃ60,000 ยท Double storey ยฃ55,000โยฃ110,000. Double-storey is cheaper per mยฒ (ยฃ1,800โยฃ2,600/mยฒ vs ยฃ2,000โยฃ3,000/mยฒ) but harder to get planning. Side-by-side cost, ROI, planning and build-time breakdown for 2026 UK homes.
Planning differs significantly between the two
Most single-storey rear extensions are Permitted Development. Double-storey rear extensions almost always need full planning permission โ this single rule shifts whole projects from 8 to 16+ weeks before site start.
Read the extension planning rules โSingle vs Double Storey: Direct Comparison
All figures from BestBuilders 2026 UK pricing data, averaged across 519 towns.
| Factor | Single storey | Double storey |
|---|---|---|
| Total cost (20 mยฒ footprint) | ยฃ40,000 โ ยฃ60,000 | ยฃ70,000 โ ยฃ104,000 |
| Cost per mยฒ | ยฃ2,000 โ ยฃ3,000 | ยฃ1,800 โ ยฃ2,600 (cheaper) |
| Floor area added (20 mยฒ footprint) | 20 mยฒ | 40 mยฒ (double) |
| Build time on site | 12 โ 16 weeks | 18 โ 26 weeks |
| Planning | Often Permitted Development | Almost always full planning |
| Disruption | Lower โ ground floor only | Higher โ affects bedrooms above |
| Garden lost | Same as double | Same as single (no extra) |
| Typical ROI | ยฃ1.10 โ ยฃ1.40 / ยฃ1 | ยฃ1.30 โ ยฃ1.70 / ยฃ1 |
| Resale uplift | Better kitchen / dining | Extra bedroom + bathroom |
Which Extension Should You Choose?
Single-storey wins whenโฆ
- You want a kitchen-diner extension (most common UK use)
- Speed matters (PD route shaves 8โ12 weeks before start)
- Budget is the dominant constraint
- You're in an Article 4 area where double-storey planning is unlikely
- Roof works above would damage existing dormer or roof structure
Double-storey wins whenโฆ
- You need bedrooms (each bedroom typically adds 8โ12% to value)
- You want best ยฃ/mยฒ โ extra storey is cheap because foundations and roof are shared
- Garden depth limits footprint expansion
- You're prepared for full planning timeline
- Long-term family home rather than 5-year project
Differences Beyond the Headline Price
Both extensions share most hidden costs โ but a few are materially different.
๐ Planning fees & timeline
Single-storey under PD: ยฃ129 LDC and 8 weeks. Double-storey full planning: ยฃ258 fee and 12โ16 weeks before site start.
๐ Foundations
Same foundation work in both โ you're reusing them on a double-storey, hence the better ยฃ/mยฒ. The structural margin needed for double-storey often pushes foundations slightly deeper.
🏛 Party wall surveyors
Both trigger PWA notices. Double-storey almost always means dissents on terraces and semis as the second storey impacts a much larger area of the neighbour wall.
๐ First floor disruption
Double-storey requires opening the existing first floor for plumbing/electrics. Decoration of existing rooms is rarely in the quote and adds materially to total spend.
โ Temporary kitchen / bathroom
Most homeowners stay in the property. Single-storey usually allows kitchen-in-place; double-storey often requires temporary kitchen + bathroom for 4โ6 weeks.
๐ Contingency (always)
10% on a single-storey, 12โ15% on a double-storey. Larger projects = more surprises.
Compare Extension Costs by Town
Each town page shows local extension specialists, town-specific cost ranges and free quote requests.
Get Quotes for Both Options
Builders will quote single AND double-storey for the same footprint, side-by-side. BestBuilders matches you with up to 3 vetted local extension specialists, free.