Single vs Double Storey Extension: 2026 UK Cost Comparison

Single storey ยฃ30,000โ€“ยฃ60,000 ยท Double storey ยฃ55,000โ€“ยฃ110,000. Double-storey is cheaper per mยฒ (ยฃ1,800โ€“ยฃ2,600/mยฒ vs ยฃ2,000โ€“ยฃ3,000/mยฒ) but harder to get planning. Side-by-side cost, ROI, planning and build-time breakdown for 2026 UK homes.

๐Ÿ“Š
Real DB pricing across 519 towns
๐Ÿ“…
Updated 2026
โœ…
FMB & CIOB-vetted
๐Ÿ†“
Free quotes

Compare Single vs Double Storey for Your Home

Pick footprint and region โ€” see both extension costs side-by-side instantly.

Single storey โ€” 2026 estimate
ยฃ40,000 โ€“ ยฃ60,000
Cheaper, faster, easier planning
Double storey โ€” 2026 estimate
ยฃ70,000 โ€“ ยฃ104,000
Better ยฃ/mยฒ, double the floor area
Get 3 Free Quotes โ†’
Standard 20 mยฒ ยท Standard spec ยท UK average
๐Ÿ“‹

Planning differs significantly between the two

Most single-storey rear extensions are Permitted Development. Double-storey rear extensions almost always need full planning permission โ€” this single rule shifts whole projects from 8 to 16+ weeks before site start.

Read the extension planning rules โ†’

Single vs Double Storey: Direct Comparison

All figures from BestBuilders 2026 UK pricing data, averaged across 519 towns.

FactorSingle storeyDouble storey
Total cost (20 mยฒ footprint)ยฃ40,000 โ€“ ยฃ60,000ยฃ70,000 โ€“ ยฃ104,000
Cost per mยฒยฃ2,000 โ€“ ยฃ3,000ยฃ1,800 โ€“ ยฃ2,600 (cheaper)
Floor area added (20 mยฒ footprint)20 mยฒ40 mยฒ (double)
Build time on site12 โ€“ 16 weeks18 โ€“ 26 weeks
PlanningOften Permitted DevelopmentAlmost always full planning
DisruptionLower โ€” ground floor onlyHigher โ€” affects bedrooms above
Garden lostSame as doubleSame as single (no extra)
Typical ROIยฃ1.10 โ€“ ยฃ1.40 / ยฃ1ยฃ1.30 โ€“ ยฃ1.70 / ยฃ1
Resale upliftBetter kitchen / diningExtra bedroom + bathroom

Which Extension Should You Choose?

Single-storey wins whenโ€ฆ

  • You want a kitchen-diner extension (most common UK use)
  • Speed matters (PD route shaves 8โ€“12 weeks before start)
  • Budget is the dominant constraint
  • You're in an Article 4 area where double-storey planning is unlikely
  • Roof works above would damage existing dormer or roof structure

Double-storey wins whenโ€ฆ

  • You need bedrooms (each bedroom typically adds 8โ€“12% to value)
  • You want best ยฃ/mยฒ โ€” extra storey is cheap because foundations and roof are shared
  • Garden depth limits footprint expansion
  • You're prepared for full planning timeline
  • Long-term family home rather than 5-year project

Differences Beyond the Headline Price

Both extensions share most hidden costs โ€” but a few are materially different.

๐Ÿ“‹ Planning fees & timeline

Single-storey under PD: ยฃ129 LDC and 8 weeks. Double-storey full planning: ยฃ258 fee and 12โ€“16 weeks before site start.

Double-storey adds: 8โ€“12 weeks pre-build

๐Ÿ— Foundations

Same foundation work in both โ€” you're reusing them on a double-storey, hence the better ยฃ/mยฒ. The structural margin needed for double-storey often pushes foundations slightly deeper.

Double-storey adds: ยฃ1,500 โ€“ ยฃ4,000

🏛 Party wall surveyors

Both trigger PWA notices. Double-storey almost always means dissents on terraces and semis as the second storey impacts a much larger area of the neighbour wall.

Double-storey adds: ยฃ2,000 โ€“ ยฃ6,000

๐Ÿ›˜ First floor disruption

Double-storey requires opening the existing first floor for plumbing/electrics. Decoration of existing rooms is rarely in the quote and adds materially to total spend.

Double-storey adds: ยฃ2,500 โ€“ ยฃ6,000

โ˜• Temporary kitchen / bathroom

Most homeowners stay in the property. Single-storey usually allows kitchen-in-place; double-storey often requires temporary kitchen + bathroom for 4โ€“6 weeks.

Double-storey adds: ยฃ800 โ€“ ยฃ2,500

๐Ÿ“Š Contingency (always)

10% on a single-storey, 12โ€“15% on a double-storey. Larger projects = more surprises.

Both: 10โ€“15% of total

Compare Extension Costs by Town

Each town page shows local extension specialists, town-specific cost ranges and free quote requests.

View all 519 UK towns โ†’

Get Quotes for Both Options

Builders will quote single AND double-storey for the same footprint, side-by-side. BestBuilders matches you with up to 3 vetted local extension specialists, free.

Takes 60 seconds ยท No spam ยท No obligation

Single vs Double Storey FAQs

Significantly. A 20 mยฒ footprint single storey costs about ยฃ45,000 average; the same footprint double-storey adds 40 mยฒ of floor area for around ยฃ85,000. Per-mยฒ you save 15โ€“20% by going double on the same plan, because foundations, roof, party wall and overhead costs are shared.
Double-storey typically adds more in cash terms because the second storey usually creates a bedroom โ€” each extra bedroom adds 8โ€“12% to UK property values in 2026. Single-storey generally returns better in percentage of project cost, particularly when it creates an open-plan kitchen-diner.
Single-storey rear extensions usually fall under Permitted Development if up to 4m on detached homes, 3m on others (or up to 6m/8m via the Larger Home Extension prior approval scheme). Double-storey rear extensions are limited to 3m projection, must be 7m from the rear boundary and must not exceed the existing roof height โ€” conditions almost no double-storey design meets, so full planning is required in nearly all cases.
Single-storey: 4โ€“6 months total (1โ€“2 months design + planning, 12โ€“16 weeks on site). Double-storey: 7โ€“10 months (3โ€“4 months design + planning, 18โ€“26 weeks on site). The pre-build phase is usually where double-storey loses time โ€” the actual additional build time is only about 6โ€“8 weeks for the second storey.
Most homeowners do, but expect significant disruption. Bedrooms above the working floor become unusable for 6โ€“10 weeks during structural work. Many families use the school holidays as a strategic move-out point or rent locally for 4โ€“8 weeks. Single-storey is much easier to live through.
No โ€” it's usually 30โ€“40% more expensive overall. You pay for the same foundations and roof twice, plus a second mobilisation, party wall round and design fee cycle. If you can see yourself wanting the second storey within 5 years, build it now.