Moving Home Checklist: Building Work to Do Before You Move In

The cheapest time to do work on a house is before your furniture arrives. An empty property means no belongings to protect, no working around family life, and trades that can run a job straight through instead of in evening slices. This checklist covers what to do before you move in, when to book each trade, the paperwork to collect, and the jobs that are better left until later.

Empty-house window Book trades 4โ€“6 weeks out Updated August 2026
Get My 3 Free Quotes
60 seconds ยท No spam ยท No obligation
FMB-Vetted Builders
2,100+ Verified Reviews
IBG Available
3 Free Quotes in 24h

Why the empty-house window is worth planning for

The cheapest time to do work on a house is the stretch when nobody lives in it. There is no furniture to move room to room, no need to seal off living space, no working around bedtimes, and a trade can run a job start-to-finish instead of in evening-and-weekend slices. The same job often takes fewer days empty than occupied, and fewer days is what actually drives the price.

That window is usually short โ€” the gap between completion and your move-in date, sometimes only a week or two. Using it well means deciding early which jobs genuinely benefit from an empty house, and booking those trades before you have the keys.

Moving home checklist: what to do and when

Work backwards from your completion date. The dates below assume a typical purchase; compress them if your chain moves quickly.

WhenWhat to do
At offer acceptedBook your survey. The findings decide which trades you need, so everything else waits on this.
6โ€“8 weeks outRead the survey properly. Separate urgent defects from "monitor". Start getting quotes for anything urgent.
4โ€“6 weeks outBook removals and, if needed, house clearance. Peak slots (Fridays, end of month) go first.
At exchangeAsk the agent for access so trades can measure and quote properly. Confirm provisional start dates.
2โ€“3 weeks outOrder long-lead items โ€” flooring, doors, worktops, made-to-measure glazing.
Completion weekEmpty-house jobs run now: rewiring, plastering, floors, full-room decorating.
Move-in weekFinal clean, appliance connection, locks and safety checks.
First monthCollect certificates, register the boiler and any notifiable work, snag the jobs you paid for.

The jobs that are genuinely easier before you move in

These are the jobs where an empty house changes the price or the disruption enough to be worth sequencing around. Follow the links for current UK costs on each.

ServiceWhen you need it
RewiringNeeds floors up and walls chased โ€” brutal with furniture in, straightforward empty.
Plastering and skimmingWhole-room wet work with long drying times. Far easier with no belongings to protect.
FlooringLaid wall to wall in one pass instead of room-by-room around furniture.
Painting and decoratingFull-house decorating is quickest and cheapest when every room is empty at once.
Damp proofingNeeds skirtings off and walls left to dry. Do it before floors and decorating, never after.
Boiler replacementNo days without heating or hot water if it is done before you move in.
Kitchen renovationAvoids weeks of living without a kitchen โ€” the single most disruptive room to do occupied.
Bathroom renovationSame logic, and critical if the property has only one bathroom.

Services we can arrange for your move

BestBuilders matches you with vetted local trades for any of the jobs below โ€” one short form, up to three quotes, no obligation.

ServiceWhen you need it
Building surveyBefore you commit โ€” the report that drives every other decision here.
General builderMultiple trades, or a job that needs someone to run it.
House clearanceProperty left full, or an inherited home to empty.
Skip hireStrip-out waste, old carpets, garden clearance.
Removal companiesThe move itself โ€” book earlier than feels necessary.
Full renovationWhen the whole property needs bringing up to standard.

Paperwork to collect while you are at it

New owners chase this paperwork years later when they sell, usually at the worst moment. Collect it as each job finishes, not at the end.

  • Building control completion certificate for any notifiable work โ€” structural alterations, most electrics, new heating appliances, replacement windows.
  • Electrical certificate (an EIC or Minor Works Certificate) for anything an electrician touched, plus the Part P notification where it applies.
  • Gas Safe records for boiler or gas appliance work, and the manufacturer's warranty registration โ€” many warranties are void without registration inside the stated window.
  • Written quotes and invoices for every job, showing what was included. See what a fair invoice looks like.
  • Guarantees for damp proofing, roofing and timber treatment โ€” usually the insurance-backed guarantee, not just the trade's own promise.
  • Product paperwork for flooring, worktops and glazing, in case of a later defect claim.

Check who is notifying building control before work starts. It is normally the trade under their competent-person scheme, but if nobody does it, the liability lands on you as the homeowner. Guidance is on gov.uk.

Moving home FAQs

Before, wherever the timing allows. An empty house has no furniture to shift or protect, no dust sheets over your belongings and no family living around the work, so trades move faster and quote lower. Floors, rewiring, plastering and full-room decorating are the clearest wins. Work that can wait โ€” a kitchen you are still designing, or a loft conversion needing planning โ€” is better done properly later than rushed before completion.
Yes, and you should. Ask the seller's agent for access for trade visits once contracts are exchanged; most sellers agree because it does not affect them. Before exchange you have no right of access, so a quote based on the estate agent's photos and a survey is the realistic fallback โ€” treat it as an estimate, not a fixed price.
For anything more than a day's work, four to six weeks. Good local trades are usually booked several weeks ahead, and the gap between exchange and completion is often shorter than that. Booking on a provisional date with a written note that it depends on completion is normal and most trades will accommodate it.
Tell the trade immediately and pause anything that touches the affected area. Damp, structural movement and unsafe wiring change the order of work โ€” there is no point laying a new floor over a damp problem. It is usually cheaper to re-sequence than to redo.
It depends on the work, not on whether you live there. Structural alterations, most electrical work, new heating appliances and window replacements are notifiable regardless. Ask the trade in writing who is notifying building control and make sure you receive the completion certificate โ€” you will need it when you come to sell.

Get 3 Free Quotes for Your Move โ€” Vetted UK Trades

Tell us what the property needs and BestBuilders matches you with up to 3 vetted local trades. One form, no cost, no obligation.

Get My 3 Free Quotes
60 seconds ยท No spam ยท No obligation
Get My Free Quotes →
Reviewed by the BestBuilders editorial team on 5 August 2026 ยท Next scheduled review: November 2026 ยท See our editorial standards.