Kitchen Extension vs Rear Extension: Cost Compared (2026)
A rear extension describes the structure (a single-storey build off the back of the house); a kitchen extension is a rear extension that happens to house a new kitchen. So the shell costs the same โ roughly ยฃ2,000โยฃ3,000/mยฒ in 2026 โ and the real cost gap is the kitchen fit-out, which adds ยฃ8,000โยฃ30,000+ depending on units, worktops and appliances. This guide compares the two line by line so you can budget accurately and decide which adds more value to your home.
Cost per mยฒ Shell vs fit-out Resale value
Side by Side
Kitchen Extension vs Rear Extension (2026)
Typical single-storey build, 20 mยฒ, standard spec, England & Wales.
Which to Choose
Which Adds More Value?
- For resale, the fitted kitchen extension wins. A modern open-plan kitchen-diner is the single most requested feature by UK buyers and typically returns 60โ80% of its cost at sale, more in higher-value areas.
- For pure floor-space-per-pound, the empty rear extension is cheaper. If you only need a bigger living room or playroom, you skip the ยฃ8kโยฃ30k kitchen bill entirely.
- Watch the kitchen spec creep. The shell price is predictable; the kitchen is where budgets blow out. Set the units/worktop/appliance budget before you start.
- Both usually fall under permitted development up to 6m (terraced/semi) or 8m (detached) under the larger-home extension rules โ but check before you commit.
Free Quotes
Compare Real Extension Quotes
BestBuilders matches you with up to 3 vetted UK extension builders โ get like-for-like quotes for a shell or a full kitchen extension.
Get My 3 Free Extension Quotes
Takes 60 seconds ยท No spam ยท No obligation
Frequently Asked
Common Questions
Only by the cost of the kitchen itself. The building shell costs the same โ ยฃ2,000โยฃ3,000/mยฒ. A kitchen extension adds ยฃ8,000โยฃ30,000+ for units, worktops, appliances and plumbing on top.
A fitted open-plan kitchen-diner extension usually adds the most resale value because it's the feature UK buyers most want. An empty rear extension adds space cheaply but less wow-factor.
Often neither โ single-storey rear extensions up to 6m (terraced/semi) or 8m (detached) usually fall under permitted development with prior approval. Conservation areas and listed buildings are exceptions.
A single-storey shell is typically 8โ12 weeks. A kitchen extension adds 2โ4 weeks for the kitchen fit, plumbing and electrics, so budget 10โ16 weeks all-in.
Get at least 3 like-for-like written quotes on the same spec and drawings. Extension prices vary 30โ50% between builders for identical work, so comparing fairly is the single biggest money-saver.