Compare ยท Updated May 2026

Fixed Price vs Cost Plus Builder Contracts (2026 UK Guide)

UK extension builders quote in two fundamentally different ways: fixed price (you agree one number for the whole job) or cost plus (you pay materials + labour at cost + a margin, typically 12โ€“20%). Fixed price gives you certainty but bakes in a 10โ€“18% โ€œrisk premiumโ€ โ€” the builder's protection against unknown ground conditions, material price moves, and scope creep. Cost plus is leaner and more transparent but transfers cost risk to you: budget overruns hit your wallet, not the builder's. This guide shows when each model wins, the contract clauses to insist on, and a real ยฃ68k Bristol extension priced both ways.

Both models priced 8 contract clauses JCT & bespoke compared
โœ… Vetted Extension Builders
๐Ÿ’ฌ 1,900+ Verified Reviews
๐Ÿ›ก Minimum ยฃ2m Public Liability
๐Ÿ†“ Always Free for Homeowners

Fixed price vs cost plus โ€” which is right for you?

  • Choose fixed price if you want budget certainty, the design and spec are fully resolved before signing, and you'd rather pay a 10โ€“18% premium than face overrun risk.
  • Choose cost plus if you trust the builder, your spec will evolve (heritage, period property, design-led project), and you can absorb 10โ€“25% overruns without it derailing the project.
  • Hybrid โ€œtarget costโ€ models (most JCT IC 2016/24 contracts) split overrun pain and gain between you and the builder โ€” typically the best middle ground above ยฃ80k project value.

Fixed Price vs Cost Plus โ€” The Eight Differences That Matter

AreaFixed PriceCost Plus
Headline priceOne number, all-inEstimate + open book
Risk premium10โ€“18% includedZero โ€” paid only if needed
MarginHidden in priceStated openly (12โ€“20%)
Spec changesVariation order + premiumJust buy the spec you want
Cash flowStage payments fixedMonthly actuals + margin
TransparencyLow (opaque mark-ups)High (receipts shared)
DisputesScope-creep argumentsMargin/markup audits
Best contract templateJCT MW 2016/24JCT IC 2016/24 + cost-reimbursable schedule

Real Project: Bristol Single-Storey Rear Extension Priced Both Ways

25mยฒ single-storey rear extension, mid-range spec. Same builder, same brief, same March 2026 start. Here's how each contract played out.

Fixed Price quote

ยฃ78,400
One number, payable in 6 stages, no variation costs unless you change the spec.
  • Builder absorbed a ยฃ2,800 steel-price rise (good for owner)
  • Owner requested an island upgrade mid-build โ€” ยฃ6,200 variation order
  • Final cost: ยฃ84,600 (variation only)

Cost Plus quote

~ยฃ68,000 + 15%
Estimated ยฃ68k actual cost, paid monthly against receipts, plus 15% builder margin on all spend.
  • Actual material cost ran ยฃ71,200 (ยฃ3,200 over due to steel rise)
  • Owner upgraded kitchen island mid-build at cost โ€” no premium
  • Final cost: ยฃ86,900 (ยฃ75,500 actual ร— 1.15)

Verdict: Without the kitchen upgrade, cost plus would have come in at ยฃ82,000 โ€” saving ยฃ2,600 vs fixed. With it, both landed within 3% of each other. The decision came down to risk appetite: fixed price felt safer; cost plus felt more honest.

Get Quotes in Both Formats from Vetted Builders

BestBuilders matches you with up to 3 vetted UK extension builders. Compare fixed and cost-plus pricing side by side โ€” free, no obligation.

Takes 60 seconds ยท No spam ยท No obligation

Common Questions

Almost always, by about 10โ€“18% on the build-cost line. The builder bakes in contingency for ground conditions, weather, material price moves and minor scope drift. The premium is the price of certainty โ€” think of it as a fully insured holiday vs paying for each thing as you go.
The contract. Insist on (a) open-book accounting with receipts, (b) trade discounts passed through, (c) labour rates capped at a stated ยฃ/day, (d) a stated maximum margin %, and (e) a not-to-exceed price ceiling agreed up front. The 5-step structure removes 80% of overspending risk.
A hybrid where you agree a target final cost. If actual cost comes in under target, both parties share the saving (typically 50/50). If it comes in over target, both share the pain. The structure aligns incentives and is the standard JCT IC 2016/24 approach for projects over ยฃ80k.
Cost plus, almost always. Heritage projects uncover surprises (rot, asbestos, structural defects) that fixed-price builders price in at the worst-case. Cost plus lets you only pay for what's actually needed โ€” typically saving 10โ€“20% on the total.
Fixed price. If the design is fully resolved, the builder can price it tightly and the certainty is worth the small premium. Avoid cost plus on tight-spec jobs โ€” you pay margin on every variation without the upside.
Strongly recommended for projects over ยฃ50k. JCT Minor Works (MW) suits fixed-price residential extensions; JCT Intermediate (IC) suits target-cost or cost-plus. Templates cost ยฃ150โ€“ยฃ300 and protect both sides on payment, defects, and disputes. Bespoke builder contracts often favour the builder โ€” always ask a solicitor to review.

Related Guides

More comparison and decision guides to help you pick the right builder and contract.

How to Hire a Trusted Bathroom Fitter

Vetting questions, red flags and the documentation to insist on before signing.

Read Guide โ†’

UK House Extension Cost 2026

Full framework for budgeting any UK extension โ€” rear, side, wrap or two-storey.

Read Guide โ†’

All Comparison Guides

Side-by-side breakdowns to help you make confident decisions on builders, materials and spec.

Browse Compare โ†’

Compare Fixed Price & Cost Plus Quotes

Tell us your postcode and rough project scope. We'll match you with up to 3 vetted extension specialists in 24 hours โ€” free, no obligation.