Compare Extension Quotes UK 2026: What to Look For

Three quotes for the same extension can vary by 60%. The cheapest is rarely the best value โ€” but the most expensive is rarely the safest either. This 2026 UK comparison playbook gives you the 12-line audit that separates a fixed-price contract you can sue on from a marketing leaflet dressed as a quote.

๐Ÿ“Š
12-line UK quote audit
๐Ÿ“…
Updated 2026
โœ…
FMB & CIOB-vetted
๐Ÿ†“
Free quotes

What a Good Extension Quote Looks Like in 2026

โœ… Solid Quote Has

  • Itemised stages โ€” strip-out, foundations, frame, M&E, finishes
  • Fixed price (or clearly labelled provisional sums with caps)
  • VAT explicit โ€” included or excluded
  • Structural engineer fee shown
  • Building Control fee included
  • Public & product liability insurance disclosed
  • Stage payments tied to milestones, not weeks
  • FMB / CIOB / TrustMark badge with verifiable number

โŒ Walk Away If

  • One-page lump-sum quote with no breakdown
  • 50%+ deposit demanded upfront
  • "VAT TBC" or VAT not mentioned at all
  • No structural engineer line โ€” they will ask later
  • No insurance certificates available
  • "Allowance" lines without quantities
  • No written specification document
  • No final account / variations clause

What "Cheap, Mid, High" Look Like in 2026

Single-storey rear extensionCheapMidHigh
Per mยฒ (UK 2026)ยฃ1,800โ€“ยฃ2,200ยฃ2,400โ€“ยฃ3,000ยฃ3,200โ€“ยฃ4,500+
Risk profileHigh variation, scope creepMainstream, predictableLow risk, premium finish
Typical contractLetter quoteJCT Minor WorksJCT Intermediate
Final price drift+15โ€“30% common+5โ€“10% typical<5%

How to Compare Three Quotes Like-for-Like

1. Same drawings, same spec

Send all three builders the same drawings + 1-page specification (kitchen included? glazing spec? floor finish?). 80% of price variation traces back to scope, not labour.

2. Strip out provisional sums

Provisional sums are placeholders that get re-quoted later. Compare the fixed portion of each quote, then add provisional sums separately.

3. Check insurance & warranties

FMB MasterBond and CIOB Construction Online Pro warranties cover defects up to 10 years. A ยฃ200 warranty premium is the cheapest insurance you'll buy.

4. Reference the last 3 jobs

Ask for the last 3 completed jobs and visit one. The quote that wins on paper but fails on referencing is the one to drop.

Get 3 Apples-to-Apples Extension Quotes

BestBuilders sends the same drawings + spec to up to 3 vetted UK builders so you can compare prices on the same scope.

60 seconds ยท No spam

Compare Extension Quotes FAQs

Three is the sweet spot. More than five and the time cost outweighs the discovery; fewer than three and you can't spot outliers.
Not always โ€” but if it's 25%+ below the others, expect either scope gaps, omitted contingency or provisional-sum games. Always investigate before assuming a "find."
JCT Minor Works for projects under ยฃ150k. JCT Intermediate or RIBA Domestic Building Contract for higher value. Avoid bare letter quotes for anything over ยฃ25k.
10โ€“15% on contract signing is normal; never more than 25% upfront. The rest in stage payments tied to physical milestones (foundations, frame, watertight, finishes).