Compare Extension Quotes UK 2026: What to Look For

Three quotes for the same extension can vary by 60%. The cheapest is rarely the best value โ€” but the most expensive is rarely the safest either. This 2026 UK comparison playbook gives you the 12-line audit that separates a fixed-price contract you can sue on from a marketing leaflet dressed as a quote.

Get My 3 Free House Extension Quotes
60 seconds · No spam · No obligation
๐Ÿ“Š
12-line UK quote audit
๐Ÿ“…
Updated 2026
โœ…
FMB & CIOB-vetted
๐Ÿ†“
Free quotes

What a Good Extension Quote Looks Like in 2026

โœ… Solid Quote Has

  • Itemised stages โ€” strip-out, foundations, frame, M&E, finishes
  • Fixed price (or clearly labelled provisional sums with caps)
  • VAT explicit โ€” included or excluded
  • Structural engineer fee shown
  • Building Control fee included
  • Public & product liability insurance disclosed
  • Stage payments tied to milestones, not weeks
  • FMB / CIOB / TrustMark badge with verifiable number

โŒ Walk Away If

  • One-page lump-sum quote with no breakdown
  • 50%+ deposit demanded upfront
  • "VAT TBC" or VAT not mentioned at all
  • No structural engineer line โ€” they will ask later
  • No insurance certificates available
  • "Allowance" lines without quantities
  • No written specification document
  • No final account / variations clause

What "Cheap, Mid, High" Look Like in 2026

Single-storey rear extensionCheapMidHigh
Per mยฒ (UK 2026)ยฃ1,800โ€“ยฃ2,200ยฃ2,400โ€“ยฃ3,000ยฃ3,200โ€“ยฃ4,500+
Risk profileHigh variation, scope creepMainstream, predictableLow risk, premium finish
Typical contractLetter quoteJCT Minor WorksJCT Intermediate
Final price drift+15โ€“30% common+5โ€“10% typical<5%

How to Compare Three Quotes Like-for-Like

1. Same drawings, same spec

Send all three builders the same drawings + 1-page specification (kitchen included? glazing spec? floor finish?). 80% of price variation traces back to scope, not labour.

2. Strip out provisional sums

Provisional sums are placeholders that get re-quoted later. Compare the fixed portion of each quote, then add provisional sums separately.

3. Check insurance & warranties

FMB MasterBond and CIOB Construction Online Pro warranties cover defects up to 10 years. A ยฃ200 warranty premium is the cheapest insurance you'll buy.

4. Reference the last 3 jobs

Ask for the last 3 completed jobs and visit one. The quote that wins on paper but fails on referencing is the one to drop.

Get 3 Apples-to-Apples Extension Quotes

BestBuilders sends the same drawings + spec to up to 3 vetted UK builders so you can compare prices on the same scope.

Get My 3 Free House Extension Quotes
60 seconds ยท No spam
Get My Free Quotes →

Compare Extension Quotes FAQs

Three is the sweet spot. More than five and the time cost outweighs the discovery; fewer than three and you can't spot outliers.
Not always โ€” but if it's 25%+ below the others, expect either scope gaps, omitted contingency or provisional-sum games. Always investigate before assuming a "find."
JCT Minor Works for projects under ยฃ150k. JCT Intermediate or RIBA Domestic Building Contract for higher value. Avoid bare letter quotes for anything over ยฃ25k.
10โ€“15% on contract signing is normal; never more than 25% upfront. The rest in stage payments tied to physical milestones (foundations, frame, watertight, finishes).